Electronics Forum: week (Page 7 of 158)

Cleanliness Testing Samples - What to Use?

Electronics Forum | Mon Oct 04 11:47:00 EDT 2004 | HOSS

We are trying to deploy an Ionograph cleanliness tester and wanted to know what others are using as a standard test sample. My desire is to run the test on a weekly basis using the same medium complexity assembly. We plan to use the testing as a pr

Electrovert Econopak EPK+ Type 400F pot heater elements

Electronics Forum | Fri Feb 04 09:17:30 EST 2005 | Steve Gregory

I have a need for two heater element/strips for the pot of a Econopak EPK+ Type 400F. PN 3-0606-793-01-2. I was told it would be 2-3 weeks from Electrovert. If anybody knows of where I might get them quicker than 2-3 weeks, I sure would appreciate it

Frequency to verify the reflow profile

Electronics Forum | Fri Jun 03 10:15:14 EDT 2005 | PWH

We do both our ovens once a week. If something looks out of tolerance (we've developed acceptable tolderances based on many recorded profiles over time and oven mfg. specs.) we wait a couple hours and try again. The recorded data over time is very

MS2 molten solder surfactant

Electronics Forum | Tue Dec 26 21:28:56 EST 2006 | generalrp

Hello! About Dross reducing(recycle)everyone can check the following patent. US PATENT # 616,161 1898 year!!!! Also, from the contemprorary patents, US PATENT # 6,942,791 and some others. If using MS2 molten solder surfactant, every week you wi

Problem with IP2

Electronics Forum | Sat May 06 09:46:30 EDT 2006 | coolie1380

I am currently working on a IP2 machine. My company is doing SMT machine refurbishment. I just can�t get my ip2 to boot up to the main page. It is always struck with the {PIA 1 2 �3�} stage and the 3 is always in red. I need urgent help and any good

IP2 problem

Electronics Forum | Sun May 07 00:28:05 EDT 2006 | coolie1380

I am currently working on a IP2 machine. My company is doing SMT machine refurbishment. I just can�t get my ip2 to boot up to the main page. It is always struck with the {PIA 1 2 �3�} stage and the 3 is always in red. I need urgent help and any good

BGA opens / cracks

Electronics Forum | Sun Feb 25 11:59:33 EST 2007 | stepheniii

Just make sure you keep the half done assemblies in dry storage or do the second reflow within the time dictated by the BGAs MSD rating level. Maybe this time you did the second side with a very short wait because you were anxious about the results

Nitrogen (N2) Costs

Electronics Forum | Fri Jun 29 09:40:46 EDT 2007 | dphilbrick

We have 2 ovens and 2 wave solder machines using nitrogen. When we were running 2 shifts a day 6 days a week we were spending about $3500 per month. Currently running 1 line 5 days a week we are at about $650 per month. These costs include taxes, tan

how to measure an assembly cost of a board

Electronics Forum | Wed Jul 30 07:22:17 EDT 2008 | davef

Not sure what software you have, but somehow you must be accumulating costs by process and you probably know [or can figure-out] how many boards you processed. From this, you can calculate a standard cost of a process. Continuing, there is a thread,

SMT LEDS SOLDERING

Electronics Forum | Mon Sep 15 17:38:57 EDT 2008 | bman

We've found that storage of other LEDs from this manufacturer can be very important. On page eight of the datesheet you attached, it says: "It is recommended that LEDs out of their original packaging are IR-reflowed within one week. For extended sto


week searches for Companies, Equipment, Machines, Suppliers & Information

convection smt reflow ovens

High Throughput Reflow Oven
See Your 2024 IPC Certification Training Schedule for Eptac

World's Best Reflow Oven Customizable for Unique Applications
2024 Eptac IPC Certification Training Schedule

High Resolution Fast Speed Industrial Cameras.
Best SMT Reflow Oven

High Precision Fluid Dispensers