Technical Library: refrigeration (Page 1 of 1)

Test plan for refrigerator main board

Technical Library | 2021-08-31 03:26:45.0

Test plan for refrigerator main board

Shenzhen PTI Technology CO.,LTD

What causes temperature humidity chamber to alarm?

Technical Library | 2019-12-12 02:43:44.0

Today we discuss the reason that causes temperature humidity chamber to alarm,In most cases, the equipment alarm is caused by the improper operation in the process of use, which mainly includes following reasons:that are refrigeration system, temperature system and circulating system. First, Refrigeration system 1, refrigeration compressor overpressure alarm. If the refrigerant pressure exceeds the set value, it will stop and alarm at the same time. At this time, the fault must be eliminated and then manually reset. 2, short phase power supply, phase sequence alarm. When the external power supply of the equipment is out of phase or the phase sequence is changed, it will stop and alarm at the same time. 3. The circulating cooling water is short of water to alarm. When the water pressure of the cooling circulating water system is insufficient, it will stop and alarm at the same time, and it must wait for the fault to be eliminated and reset at the same time before it could run normally. 4, refrigeration compressor overheating alarm. When the coil of the compressor is overheated and the power supply of the line is not normal, it will stop and alarm at the same time. Second, Temperature system 1, the overtemperature alarm in the chamber. The sensors in the channel and the sample area are equipped with overtemperature protection devices, and there are also overtemperature protecter on the control panel. When the temperature in the working chamber exceeds the setting value on the controller, it will stop and alarm. 2. sample overtemperature protection. When the temperature in the sample area exceeds the protection temperature set by the controller, it will stop and alarm at the same time. The overtemperature protection of the sample is divided into upper limit protection and lower limit protection, which can be set according to the demand, Third,Circulating system 1. The alarm is caused by the overheating of the circulating fan. When the coil of the fan is over-heated, the alarm will be stopped at the same time. 2. The fan over-current alarm. When the current of the fan exceeds the allowable value, the alarm is stopped at the same time, and the normal operation can only be carried out after the fault maintenance of the overcurrent is completed. This is what we talk about today,if you have more questions,let us know.

Symor Instrument Equipment Co.,Ltd

Factors determine the price of temperature humidity test chamber

Technical Library | 2019-12-16 22:20:55.0

When we were children,our parents always warn us "Do comparison shopping before you buy",why they say like this?this is a very simple truth, for the first deal,we are always cautious, through continuous comparison in order to find out the best quality, service, after-sale and price. This apply to any industry,there are many manufacturers of environmental test equipment. When some customers inquire a temeprature humidity test chamber, they will find a very common problem. Why is the price of the same equipment quoted by the two manufacturers very different? 1, the chamber body process,which effects the exterior case quality,this price has a gap. 2, the components, esp.components of the refrigeration system, is the core value of the temperature humidity test chamber. 3, even if the body and refrigeration components are the same, some prices are different, that is the manufacturer technical level. 4, regional issues, Wuxi,Changzhou, Dongguan, these brands need to know more. 5. after-sales, a powerful manufacturer often with a sound after-sales service dept.. The above are both technical and service, as well as the delivery cost of goods to the local and overseas are different.

Symor Instrument Equipment Co.,Ltd

Precision Cleaning in 21st Century: New Solvent with Low Global Warming Potential

Technical Library | 2012-11-15 23:38:50.0

First published in the 2012 IPC APEX EXPO technical conference proceedings. As we progress in the 21st century, electronics manufacturing will need more and more precision. Parts will get more complex since more components have to be assembled in smaller spaces. Circuit boards and other electronic assemblies will become more densely populated; spacings between components will be shorter. This will require precision manufacturing and efficient cleaning during and post manufacturing. In addition, with population and technology progressing, larger amount of greenhouse gases will be emitted resulting in higher global warming. Intense research effort is going on to develop new generation of chemicals to address both cleaning and global warming issues. Low global warming solutions in refrigeration and as insulating agents are already in the marketplace.

Honeywell International

Corrosion Resistant Servers for Free-Air Cooling Data Centers

Technical Library | 2016-11-10 17:37:35.0

The demand for compute capability is growing rapidly fueling the ever rising consumption of power by data centers the worldwide. This growth in power consumption presents a challenge to data center total cost of ownership. Free-air cooling is one of the industrial trends in reducing power consumption, the power usage effectiveness (PUE) ratio, and the total cost of ownership (TCO). Free-air cooling is a viable approach in many parts of the world where the air is reasonably clean. In Eastern China, the poor quality of air, high in particle and gaseous contamination, is a major obstacle to free-air cooling. Servers exposed to outside air blowing in to data centers will corrode and fail at high rate. The poor reliability of hardware increase TCO dramatically. This paper describes a corrosion resistant server design suitable for reliable operation in a free-air cooling data center located in Eastern China where the indoor air quality can be as poor as ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers) severity level G3. An accelerated corrosion test method of verifying hardware reliability in the ASHRAE severity level G3 environment is also described.

IBM Corporation

  1  

refrigeration searches for Companies, Equipment, Machines, Suppliers & Information