Electronics Forum | Tue Jul 11 13:21:30 EDT 2000 | Deborah Troxell
We use the Slimkic for our oven porfiles and run a very high product mix too. My first question is do you use the same progam for all your boards or do you run different temptures profiles for each module? How are the gold boards getting destroyed? W
Electronics Forum | Wed Oct 12 22:22:31 EDT 2005 | zl3vlf
Hi all! Well installing the servo card has fixed the status LED issue....however there is a new problem :( When a production program is executed at the IP3 (pressing AUTO or START) the machine says 'communicating with the VP' (which is normal). Wh
Used SMT Equipment | Soldering Equipment/Fluxes
The following Ersa Ecoselect 350 is a lead free selective solder system with various spares. It is included in the Manroland Online Auction scheduled for August 27-28 on www.xlineassets.com. This system will be sold to the highest bidder and is curre
Used SMT Equipment | SPI / Solder Paste Inspection
Koh Young 3D KY8030-L Solder Paste Inspection Machine (2008) Brand: Koh Young 3D SPI Model: KY8030-L Year: 2008 Serial #: SPI-8L110 Machine Size: Large Max Panel Dimensions: 510mm x 510mm &n
Industry News | 2017-07-10 15:53:28.0
Aegis Software announces its partnership with SEICA who provide services to top tier global EMS and OEM companies, a relationship that will enable Aegis to continue its vision to expand its software solutions offerings within Europe.
Career Center | , Florida USA | Production
We are looking for an individual to progam and maintain Universal GSM1's and HSP 4791 placement machines. Only persons with UIC experience will be considered.
Career Center | Seven Hills, Ohio USA | Engineering,Production
The qualified candidate will be responsible for the operation and progamming of pick and place machines. This will include operating screen printing equipment set-up of reflow and cleaning systems and tear down of said systems. Hand soldering of in
Career Center | Parañaque, Philippines | Maintenance
JOB DESCRIPTION Preventive Maintenance Execution of Preventive Maintenance activities, using the following frame work: Machine Cleaning, Inspection, Lubrication, Repair, Replace and Calibration. PM Documentation PM Master schedule PM Checklist Wo