Industry Directory: lead time (294)

KS International Trading HK Limited

KS International Trading HK Limited

Industry Directory | Manufacturer

We provide SMT MACHINES, SMT FEEDER, SMT NOZZLES, SMT MOTORS and many high quality spare parts. We supply the service to ensure that customers SMT equipments can be replaced timely with the required spare parts.

Shenzhen ETA Technology Co., Ltd

Industry Directory | Contract Manufacturer / Equipment Dealer / Broker

I.C.T is the world's leading provider of SMT factory planning solutions, providing SMT Machine, More than 25 years of experience.

New SMT Equipment: lead time (53988)

Precision Lead Former for Taped RADIAL Components (CF-9)

Precision Lead Former for Taped RADIAL Components (CF-9)

New Equipment | Lead Forming

The CF-9 Radial Lead Former forms and cuts 2- and 3-leaded taped radial components such as TO-92s, capacitors, transistors, LEDs, etc. - precisely and repeatedly, in standard and special forms. This machine is capable of forming and cutting up to 25

GPD Global

Lead Former for Bulk or Loose RADIAL Components (CF-10)

Lead Former for Bulk or Loose RADIAL Components (CF-10)

New Equipment | Lead Forming

Form & Cut 2-, 3-, 4-, 5-, and 7-leaded Radial Components Capable of forming loose radial components at rates up to 5,000 parts per hour with a variable speed motor. Feed components by hand or with tubes (TO-220s) Reduce setup time with quick ch

GPD Global

Electronics Forum: lead time (1648)

Hand Solder - time alloted per lead

Electronics Forum | Tue Dec 11 08:58:31 EST 2001 | zanolli

Go to http://www.tekais.com and then to the the "Self Soldering Connectors"

Hand Solder - time alloted per lead

Electronics Forum | Fri Dec 07 09:43:04 EST 2001 | Russ Steiner

I have a mixed technology PCB that has SMT all on bottom, TH parts on both sides (Yes, I realize that's bad. Can't be avoided.) We have designed a 10-up panel, 2 x 5 array. There are 50 leads per bd, 500 per panel. How much time is reasonable to a

Used SMT Equipment: lead time (163)

Hexi RFN1020/N

Hexi RFN1020/N

Used SMT Equipment | Soldering - Reflow

HEXI, Lead-Free reflow soldering machine, type RFN1020/N, s.n. 0611018, Left to Right, with 10 heating heads plus cooling head, lenght of heating zones 3365mm,max width of PCB 450 mm, width of conveyor 50 to 450 mm, height of conveyor 920 +/_ 20 mm,

Baja Bid

YesTech YTV-F1

YesTech YTV-F1

Used SMT Equipment | AOI / Automated Optical Inspection

YesTech YTV-F1 Automated PCB Inspection System >Multi-function all purpose In-Line system • (2) Top-down Cameras; Incl. (1) High Magnification • (4) side viewing cameras • LED top light, bi-color multiangle LED lighting •

Baja Bid

Industry News: lead time (4900)

Lean Stream & Heller Reflow Technology to Partner in CA & NV

Industry News | 2015-11-12 22:03:28.0

Heller Industries is thrilled to announce that we've partnered with the #1 Northern California Sales Representative Group - Lean-Stream!

Heller Industries Inc.

Henkel Names New Global Sales Director for Semiconductor Materials

Industry News | 2009-02-02 18:48:47.0

Henkel today announced the appointment of Mr. Luc Godefroid as the company's Global Sales Director for its Semiconductor Group. A key member of Henkel's electronics sales team since 2001, Godefroid's new role sees him building on his previous success and directing the global sales efforts of Henkel's worldwide team and expanded product portfolio.

Heller Industries Inc.

Parts & Supplies: lead time (1290)

Juki 40081815 Ratchet Hook SP SMT Feeder Parts Spring For JUKI Feeder

Juki 40081815 Ratchet Hook SP SMT Feeder Parts Spring For JUKI Feeder

Parts & Supplies | Component Packaging

40081815 Ratchet Hook SP SMT Feeder Parts Spring For JUKI Feeder Specifications 1. Ratchet Hook SP 2. Part No: 40081815 3. For JUKI Feeder 4. 1 year warranty 5. Lead time: in stock

KingFei SMT Tech

Juki Thin Round SMT Feeder Parts 40081795 8mm JUKI Feeder Wheel Ring 03

Juki Thin Round SMT Feeder Parts 40081795 8mm JUKI Feeder Wheel Ring 03

Parts & Supplies | Component Packaging

Thin Round SMT Feeder Parts 40081795 8mm JUKI Feeder Wheel Ring 03 Specifications 1. Wheel Ring 03 2. Part No: 40081795 3. For JUKI Feeder 4. 1 year warranty 5. Lead time: in stock

KingFei SMT Tech

Technical Library: lead time (33)

Void Reduction in Bottom Terminated Components Using Vacuum Assisted Reflow

Technical Library | 2019-07-10 23:36:14.0

Pockets of gas, or voids, trapped in the solder interface between discrete power management devices and circuit assemblies are, unfortunately, excellent insulators, or barriers to thermal conductivity. This resistance to heat flow reduces the electrical efficiency of these devices, reducing battery life and expected functional life time of electronic assemblies. There is also a corresponding increase in current density (as the area for current conduction is reduced) that generates additional heat, further leading to performance degradation.

Heller Industries Inc.

Higher Defluxing Temperature and Low Standoff Component Cleaning - A Connection?

Technical Library | 2020-11-04 17:49:45.0

OEMs and CMs designing and building electronic assemblies for high reliability applications are typically faced with a decision to clean or not to clean the assembly. If ionic residues remain on the substrate surface, potential failure mechanisms, including dendritic growth by electrochemical migration reaction and leakage current, may result. These failures have been well documented. If a decision to clean substrates is made, there are numerous cleaning process options available. For defluxing applications, the most common systems are spray-in-air, employing either batch or inline cleaning equipment and an engineered aqueous based cleaning agent. Regardless of the type of cleaning process adopted, effective cleaning of post solder residue requires chemical, thermal and mechanical energies. The chemical energy is derived from the engineered cleaning agent; the thermal energy from the increased temperature of the cleaning agent, and the mechanical energy from the pump system employed within the cleaning equipment. The pump system, which includes spray pressure, spray bar configuration and nozzle selection, is optimized for the specific process to create an efficient cleaning system. As board density has increased and component standoff heights have decreased, cleaning processes are steadily challenged. Over time, cleaning agent formulations have advanced to match new solder paste developments, spray system configurations have improved, and wash temperatures (thermal energy) have been limited to a maximum of 160ºF. In most cases, this is due to thermal limitations of the materials used to build the polymer-based cleaning equipment. Building equipment out of stainless steel is an option, but one that may be cost prohibitive. Given the maximum allowable wash temperature, difficult cleaning applications are met by increasing the wash exposure time; including reducing the conveyor speed of inline cleaners or extending wash time in batch cleaners. Although this yields effective cleaning results, process productivity may be compromised. However, high temperature resistant polymer materials, capable of withstanding a 180°F wash temperature, are now available and can be used in cleaning equipment builds. For this study, the authors explored the potential for increasing cleaning process efficiency as a result of an increase in thermal energy due to the use of higher wash temperature. The cleaning equipment selected was an inline cleaner built with high temperature resistant polymer material. For the analysis, standard substrates were used. These were populated with numerous low standoff chip cap components and soldered with both no-clean tin-lead and lead-free solder pastes. Two aqueous based cleaning agents were selected, and multiple wash temperatures and wash exposure times were evaluated. Cleanliness assessments were made through visual analysis of under-component inspection, as well as localized extraction and Ion Chromatography in accordance with current IPC standards.

ZESTRON Americas

Videos: lead time (704)

HELLER INDUSTRIES Presents: 1936 MKV Vacuum Reflow Oven

HELLER INDUSTRIES Presents: 1936 MKV Vacuum Reflow Oven

Videos

1809 MK5 - Heller Advanced In-Line Vacuum Reflow Oven Nitrogen System with Balanced Flow Technology 9 Top And Bottom Heated Zones - highest zone count per linear foot in the industry! 100" Heated Length - for super throughput! 2 Internal C

Heller Industries Inc.

Precision Lead Former for Axial Components (CF8)

Precision Lead Former for Axial Components (CF8)

Videos

Eliminate Body Stress with Versatile CF-8 GPD's CF-8 eliminates component body stress. Versatility is the key word for the CF-8. Simple tooling changes make short or long run production jobs quick and easy. Capabilities Meets exacting military s

GPD Global

Training Courses: lead time (11)

Customizable Basic Hand Soldering

Training Courses | | | PCB Rework and Hand Soldering Courses

The PCB rework and hand soldering courses courses cover techniques of rework and repair of PCBs, BGAs and other electronics assemblies, and teach fundamentals of soldering of electronics assemblies.

Blackfox Training Institute, LLC

Failure Analysis and Reliability Testing in Electronics Manufacturing

Training Courses | | | PCB Inspection Courses

The PCB inspection courses focus on improving PCB yield and reliability through validation and detection of defects on electronics assemblies.

ACI Technologies, Inc.

Events Calendar: lead time (38)

Consider the options-How should I mask for Conformal Coating?

Events Calendar | Wed Jun 20 00:00:00 EDT 2018 - Wed Jun 20 00:00:00 EDT 2018 | ,

Consider the options-How should I mask for Conformal Coating?

Surface Mount Technology Association (SMTA)

Learning to Lead, Leading to Learn

Events Calendar | Wed Aug 26 00:00:00 EDT 2020 - Wed Aug 26 00:00:00 EDT 2020 | ,

Learning to Lead, Leading to Learn

Surface Mount Technology Association (SMTA)

Career Center - Jobs: lead time (142)

Lead Application Laboratory Technician

Career Center | Manassas, Virginia USA | Research and Development

General Job Summary   Job Title: Lead Application Laboratory Technician Classification: Exempt Reports to: Director of Application Technology Location: Onsite, Manassas, VA Is

ZESTRON Americas

Production Planner

Career Center | Dallas, Texas USA | Production

Skills/Requirements: 4 yr Degree, 5 yrs related experience, establish manufacturing lead time on regular orders to meet delivery, commitment. Collaborating with materials. Purchasing, engineering, tool room to coordinate scheduling and timing for ma

EMSR, Inc.

Career Center - Resumes: lead time (93)

Production Supervisor

Career Center | King, North Carolina | Management,Production,Quality Control

Production Supervisor Responsible for all aspects of department operations Directly supervised up to 80 team members Kaizen team leader 5S, Lean Manufacturing, working with Six Sigma tools Built team that continually produced 98% yields and Won

Electronics Supervisor

Career Center | Woodbury, Minnesota USA | Management,Production

Over 20 yrs experience in SMT. Worked with medical, industrial, communications, aerospace and automotive electronics. Have experience working in ITAR controlled companies.

Express Newsletter: lead time (840)

Partner Websites: lead time (44073)

What is your normal lead time?-PCB magazine loader,PCB turn conveyor,pcb conformal coating machine,P

ASCEN Technology | https://www.ascen.ltd/Dealer_cooperation/Pre_sale_Service/54.html

What is your normal lead time?-PCB magazine loader,PCB turn conveyor,pcb conformal coating machine,PCB router,PCB depaneling machine,pcb buffer conveyor from ASCEN technology Welcome to visit ASCEN | | | | | | | Cart

ASCEN Technology

Time Pressure Dispense Pumps

GPD Global | https://www.gpd-global.com/time-pressure-dispense-pump.php

Nozzles Real Time Process Control (FPC) Lead Formers Lead Formers Selection Axial Lead Former Radial Lead Former Peel Force Tester Peel Back Force Tester Applications APPLICATIONS OVERVIEW Conductive Adhesive Non-Conductive Adhesive Dam

GPD Global


lead time searches for Companies, Equipment, Machines, Suppliers & Information

Sm t t t t t t t t t t net
  1 2 3 4 5 6 7 8 9 10 Next