New Equipment | Industrial Automation
GE FANUC S6M4H new and Original USA 1 year warranty EMAIL:sales2@amikon.cn WEB:www.amikong.com SKYPE:ariatang111 MB(WHATSAPP):+86-18020776791 WECHAT:18020776791 Amikon supplys automation spare parts and control systems (DCS, PLC, panel c
New Equipment | Industrial Automation
GE FANUC P70360-SDN new and Original USA 1 year warranty EMAIL:sales2@amikon.cn WEB:www.amikong.com SKYPE:ariatang111 MB(WHATSAPP):+86-18020776791 WECHAT:18020776791 Amikon supplys automation spare parts and control systems (DCS, PLC, panel con
Electronics Forum | Thu Sep 20 07:18:42 EDT 2018 | proceng1
Has anyone else been experiencing this lately? We have had a rash of boards that come in properly vacuum sealed. We store them in the hot room until we are ready to build, and we get bubbles under the solder mask. We've had 4 different jobs, all di
Electronics Forum | Mon Jan 12 02:56:42 EST 2009 | sachu_70
Hi Bill, You should try pre-baking any such old devices prior to using on SMT Reflow. Refering to MSL-type3 guidelines could help in your case.
Industry News | 2019-05-16 01:24:13.0
With the development of miniaturization of assembly components, the layout area and pattern design area of PCBs have also been continuously reduced, and PCB manufacturers are constantly updating the production process to conform to the development trend. The application of the resin plugging process has also become more and more extensive, and it has been used in HDI panels.
Industry News | 2023-11-13 12:31:47.0
Circuit Technology Center announces it has added the capability to trim and form electronic component packages to customers' exact pre-assembly specifications. They can also propose a trim and lead-form drawing if needed. Dedicated, custom tooling can be fabricated to meet custom package requirements.
With the development of miniaturization of assembly components, the layout area and pattern design area of PCBs have also been continuously reduced, and PCB manufacturers are constantly updating the production process to conform to the development tr
| http://etasmt.com/cc?ID=te_news_bulletin,23574&url=_print
. (Some practitioners pre-bake components and boards to drive out moisture. This is not encouraged and should be a last resort as baking tends to build intermetallics as well as degrade the solderability by increasing oxidation levels
| http://www.thebranfordgroup.com/dnn3/Employees/OnlineAuctionAdmin/TRCCircuits/tabid/1902/Default.aspx
: The Lots will have a staggered closing time with 2 closing every minute in numerical order. For Example: Lots 1 and 2 will start to close at 10