Industry Directory | Assembly / Inspection / Repair / Rework / Soldering / OEM
A US manufacturer of quality hand tools for those engaged in the repair, rework, R & D, testing, and assembly of electronic components and printed circuit boards from Through Hole to 2Mil Pitch Surface Mount.
Industry Directory | Soldering / IPC Standards Certification Center / Consultant / Training Provider
Blackfox is the industry leader in providing IPC Certifications, Solder Training, Customized Training Programs, and Counterfeit Component Training and Certification.
Volumetric Dispense Pump - PCD Technology revolutionizes how you dispense and how you perceive dispensing. PCD - Progressive Cavity Displacement PCD is a continuously volumetric dispense pump based on the Progressive Cavity principle. PCD technolog
New Equipment | Rework & Repair Equipment
The tool ends are made of high quality Swedish Hardened Tool Steel, carefully heat treated and tempered to provide a tough, long lasting working edge that resists wear.
Electronics Forum | Fri May 12 13:08:43 EDT 2006 | acabral
Another resource for BGA Rework is VJ Electronix, they manufacture SRT Rework systems.
Electronics Forum | Mon Jun 08 16:07:55 EDT 1998 | Igmar Grewar
Our company wants to buy a rework station for BGA's. I would like to know what is a good BGA rework station. IR or hot air? Do we need a rework station with optical placement or can BGa's be placed manually during rework. We have seen a demo of an ER
Used SMT Equipment | Repair/Rework
This equipment has been barely used and is in "Like New" condition.
Used SMT Equipment | Repair/Rework
CONCEPTRONIC, Reworking station, type FREEDOM 3000, s.n. 9410051, equipped with LEICA binocular, with 2 optical magnifier 10x included, analogic readers front, AEG plc, inside control PC with Samsung flat monitor, and 8 nozzles, size approx 1,40x1,00
Industry News | 2015-06-29 15:53:53.0
Seika Machinery has announced a limited time special on select DEN-ON INSTRUMENTS CO., LTD. SMD rework stations. DEN-ON is offering 25 percent off regular pricing for the RD-500III and RD-500SIII SMD Rework station series valid now until the end of August 2015.
Industry News | 2014-08-26 16:30:01.0
Seika Machinery, Inc. will debut the RD-500V Rework Station from DEN-ON INSTRUMENTS CO., LTD. in Booth #835 at SMTA International, scheduled to take place Sep. 30 - Oct. 1, 2014 at the Donald Stephens Convention Center in Rosemont, IL.
Parts & Supplies | Repair/Rework
The RocHard 1 MilProbe is a 0.3" long Micro-tip in a 4 3/8" long hex shape stainless steel handle. The Micro-tip is tapered to a one mil diameter tip for TAB, BGA, and other ultra fine pitch rework. The tip is either straight (SH-341) or 50? angled a
Parts & Supplies | General Purpose Equipment
The new inspection mirror meets clean room requirements yet is sufficiently economical for non-clean room applications. A quality tool for the technician but inexpensive enough to meet the budgetary requirement of modern manufacturing. /8" Mirror He
Technical Library | 2021-10-06 17:48:52.0
Cleaning PCBs before conformal coating removes potentially harmful and unknown contaminants from the board's surface resulting in better adhesion of the conformal coating and thereby preventing delamination. Cleaning PCBs can ultimately prevent issues like leakage current, electrochemical migration and coating failures. From a production standpoint, it can help to decrease the cost of labor and time needed for the re-work of the boards.
Technical Library | 2018-04-27 12:59:29.0
Hot Air and IR are the two main types of rework stations used by OEMs and PCB contract manufacturers today. Both have advantages and disadvantages and choosing the right one for your application requires a careful consideration of a number of factors, including your budget, your working requirements and the capabilities of your staff. In this article, we outline some of the differences between hot air and IR BGA rework stations.
http://www.gpd-global.com No drip no drool across a wide range of fluid viscosities (low-to-mid and low-to-high). No manual adjustment to compensate for pump variability. Truly Volumetric PCD Pumps for total control of dispensing fluids. Ability to
Dispensing dots, lines and into recessed cavities. Video was shot with a lipstick camera mounted to the dispense head. http://www.nordsonasymtek.com
Training Courses | | | IPC-7711/7721 Trainer (CIT)
The Certified IPC-7711/7721 Trainer (CIT) courses recognize individuals as qualified trainers in the area of rework and repair of printed boards and electronic assemblies and prepares them to deliver Certified IPC-7711/7721 (CIS) training.
Training Courses | | | IPC-7711/7721 Specialist (CIS)
The Certified IPC-7711/7721 Specialist (CIS) training focuses on rework of electronic assemblies and repair and modification of printed boards and electronic assemblies.
Events Calendar | Mon May 04 00:00:00 EDT 2020 - Mon May 04 00:00:00 EDT 2020 | ,
Ball Grid Array Rework - How to Do It Successfully
Events Calendar | Tue Feb 19 00:00:00 EST 2019 - Tue Feb 19 00:00:00 EST 2019 | Elkridge, Maryland USA
SMTA Capital Chapter: Non-Destructive BGA/Area Array Component Rework
Career Center | Grand Prairie, Texas USA | Production,Quality Control,Technical Support
SMT Programmering Specialist. Pick and place, screen printer, AOI and quality inspection, process control, CAD and program development.
Career Center | Columbus, Ohio USA | Engineering,Management,Production,Quality Control,Research and Development,Technical Support
20 plus years of experience in a Electronics Manufacturing environment. Management experience on 1st and 2nd shift with groups up to 18 in a goverment contracted environment Experienced internal/lead auditor of ISO 9001 with years of audit experi
Article Return to Front Page Rework Management and Opti
SMT Express, Issue No. 6 - from SMTnet.com Volume 1, Issue No. 6 Monday, November 22, 1999 Featured Article Return to Front Page Rework Management and Optimization Learning how to manage the amount of time and money spent on rework can increase
| https://www.eptac.com/blog/3-common-pcb-design-mistakes
. Delicately intricate and complex, it’s not uncommon for mistakes to occur during PCB design. Since board reworks result in production delays, below are three common PCB mistakes to look out for in order to avoid functionality errors. 1
ACI Technologies, Inc. | https://www.aciusa.org/wp-content/uploads/2021/07/techtip11-2015.pdf
multiple reworks are anticipated. Additional PWB surface finishes that are used with either the traditional tin-lead or the new lead-free solders in manufacturing are immersion tin and immersion silver