Technical Library: sequencers (Page 1 of 1)

Reworking ALD Coatings

Technical Library | 2020-09-02 14:34:23.0

Atomic layer deposition (ALD) is a process of creating coatings on a molecular layer by layer basis. Using an iterated sequence of self-saturating deposition cycles that are self-terminating, a single layer can be deposited at a time, allowing for highly uniform films with complete conformality. The composition of the film typically used for coating printed wiring boards (PWBs) is a high alumina (Al2O3) sequential deposition of alumina and titania capped with a corrosion protective titanium aluminate layer, most notably ALD-Cap from Sundew Technologies, LLC. Rework is a process of restoring an electronics assembly to full functionality to prolong equipment life and reduce the amount of scrap. The process typically involves:

ACI Technologies, Inc.

Basics of Encoder and Orthogonal Coding

Technical Library | 2021-12-07 00:57:40.0

Encoder is a kind of electromechanical equipment, which can be used to measure the movement of machinery or the target position of machinery. Most encoders use optical sensors to provide electrical signals in the form of pulse sequences, which can be converted into motion, direction or position information in turn.

OKmarts Industrial Parts Mall

The Pin-in-Paste (or AART) Process for Odd Form and Through Hole Printed Circuit Boards

Technical Library | 2007-09-27 16:18:15.0

Considerable interest exists in the process known as the pinin- paste, or the Alternative Assembly and Reflow Technology (AART) process. The AART process allows for the simultaneous reflow of both odd-form and through hole devices as well as surface mount components. This process has several advantages over the typical mixed technology process sequence that includes wave soldering and/or hand soldering, often in addition to reflow soldering.

Universal Instruments Corporation

Stencil Printing Yield Improvements

Technical Library | 2014-06-05 16:44:07.0

Stencil printing capability is becoming more important as the range of component sizes assembled on a single board increases. Coupled with increased component density, solder paste sticking to the aperture sidewalls and bottom of the stencil can cause insufficient solder paste deposits and solder bridging. Yield improvement requires increased focus on stencil technology, printer capability, solder paste functionality and understencil cleaning.(...) The purpose of this research is to study the wipe sequence, wipe frequency and wipe solvent(s) and how these factors interact to provide solder paste printing yield improvement.

KYZEN Corporation

The Influence of Clean Air on the Value-Added Chain in Electronics Production

Technical Library | 2019-02-25 05:24:53.0

"The idea of the value chain is based on the process view of organizations, the idea of seeing a manufacturing (or service) organization as a system, made up of subsystems each with inputs, transformation processes and outputs".[1] The definition of a value-added chain by Michael E. Porter is one of many to be found in reference books, works and on websites. In principle, it involves a sequence of activities, executed by a manufacturing company to develop, produce, sell, ship, and maintain products or services. Three main parameters essentially influence a value-added chain: Direct activities − research, development, production, shipment etc. Indirect activities − maintenance, operation, occupational safety, environment etc. Quality assurance − monitoring, test/inspection; quality management etc. In particular, indirect activities and quality assurance generate a greater part of the costs in product manufacturing. This article principally focusses on the indirect activities, among them air purification.

ULT Canada Sales Incorporated

What causes temperature humidity chamber to alarm?

Technical Library | 2019-12-12 02:43:44.0

Today we discuss the reason that causes temperature humidity chamber to alarm,In most cases, the equipment alarm is caused by the improper operation in the process of use, which mainly includes following reasons:that are refrigeration system, temperature system and circulating system. First, Refrigeration system 1, refrigeration compressor overpressure alarm. If the refrigerant pressure exceeds the set value, it will stop and alarm at the same time. At this time, the fault must be eliminated and then manually reset. 2, short phase power supply, phase sequence alarm. When the external power supply of the equipment is out of phase or the phase sequence is changed, it will stop and alarm at the same time. 3. The circulating cooling water is short of water to alarm. When the water pressure of the cooling circulating water system is insufficient, it will stop and alarm at the same time, and it must wait for the fault to be eliminated and reset at the same time before it could run normally. 4, refrigeration compressor overheating alarm. When the coil of the compressor is overheated and the power supply of the line is not normal, it will stop and alarm at the same time. Second, Temperature system 1, the overtemperature alarm in the chamber. The sensors in the channel and the sample area are equipped with overtemperature protection devices, and there are also overtemperature protecter on the control panel. When the temperature in the working chamber exceeds the setting value on the controller, it will stop and alarm. 2. sample overtemperature protection. When the temperature in the sample area exceeds the protection temperature set by the controller, it will stop and alarm at the same time. The overtemperature protection of the sample is divided into upper limit protection and lower limit protection, which can be set according to the demand, Third,Circulating system 1. The alarm is caused by the overheating of the circulating fan. When the coil of the fan is over-heated, the alarm will be stopped at the same time. 2. The fan over-current alarm. When the current of the fan exceeds the allowable value, the alarm is stopped at the same time, and the normal operation can only be carried out after the fault maintenance of the overcurrent is completed. This is what we talk about today,if you have more questions,let us know.

Symor Instrument Equipment Co.,Ltd

A Theoretical Framework for Industry 4.0 and Its Implementation with Selected Practical Schedules

Technical Library | 2021-06-02 19:34:48.0

In recent years, there has been dynamic changes in the industrial environment as a result of further innovations called Industry 4.0 (I.4.0), especially in the field of digital technology and manufacturing. Despite numerous examples of the implementation of Industry 4.0 in enterprises, there is no general framework for the implementation of Industry 4.0 with a detailed schedule. Researching the ways of implementing Industry 4.0 is still a current and unexplored area of research. The main aim of the paper is to present the concept of the theoretical framework for Industry 4.0 implementation based on selected schedules of the Industry 4.0 implementation. The paper was based on information from literature review and analysis of pilot enterprise projects to Industry 4.0 (case study) that were conducted in selected enterprises. The paper presents the key components of the framework of Industry 4.0 and the basic stage of implementing the concept in the enterprises, paying attention to their sequence and time frames. The proposed approach is dedicated to researchers and practitioners who implement the concept of Industry 4.0 in enterprises

Silesian University of Technology

  1  

sequencers searches for Companies, Equipment, Machines, Suppliers & Information

thru hole soldering and selective soldering needs

High Throughput Reflow Oven
Pillarhouse USA for handload Selective Soldering Needs

High Precision Fluid Dispensers
best pcb reflow oven

World's Best Reflow Oven Customizable for Unique Applications
SMT spare parts

500+ original new CF081CR CN081CR FEEDER in stock