Electronics Forum: speed line (Page 1 of 41)

YesTech F1 speed

Electronics Forum | Fri Jul 19 14:51:24 EDT 2013 | rway

So what AOI system are you using and what auto-insertion equipment is on the line?

YesTech F1 speed

Electronics Forum | Fri Jul 19 10:19:01 EDT 2013 | rway

We have inline reworkers, so this time has been factored in. We currently use Siemens S25/20 machines with M1 systems. The placement machines run a little slower than the AOI at times so there is time to perform review, most of the time. It's not

YesTech F1 speed

Electronics Forum | Thu Jul 18 18:32:18 EDT 2013 | rway

Hello all, I was wondering who out there has an F1 or F1-5 system used at post-paste. If so, what type of auto-insertion equipment are you using on that line and what is the cph placement capability. Does your F1 system keep up with the cycle time

YesTech F1 speed

Electronics Forum | Fri Jul 19 12:58:13 EDT 2013 | rway

The review time varies depending on the product. But it could take anywhere from 10s to over a minute depending. That doesn't leave much time left on this new line. What AOI are you using now and with what equipment?

YesTech F1 speed

Electronics Forum | Fri Jul 19 14:54:41 EDT 2013 | dontfeedphils

I suppose I worded that poorly, we run a B2 bench-top unit later on in the process (QA area to be exact) so it isn't in line with anything and doesn't have to keep up with anything feeding it upstream. And we run Juki equipment.

When to implement high speed pick and place machines?

Electronics Forum | Tue Feb 04 05:15:40 EST 2014 | spoiltforchoice

Take a look at the ROI tools supplied my MyData and others and draw inspiration from there. Presumably if you are looking at a higher speed line you are looking at higher throughput than you currently achieve or possibly fewer/shorter shifts? The eco

SMT p&p new line

Electronics Forum | Thu Jul 20 11:28:40 EDT 2006 | Rob

Mydata are OK, but they will not last as long as the Siplace if running the same volume. They are easy to programme, change over & upgrade - they are very good entry level machines. One thing to remember is that they make use of large scale gang pi

SMT line validation

Electronics Forum | Wed Feb 22 12:40:41 EST 2006 | russ

Here are some of the things we had to do when we had to validate process. Incoming voltage Air pressure squeegee speed placement accuracy oven stability

Compressor air line material

Electronics Forum | Mon Jun 25 09:59:41 EDT 2007 | slthomas

Plastic of any kind for compressed air is a code violation here. It's not just the pressure, it's the durability. PVC is pretty brittle and if you smack it with a pallet jack it's a lot more likely to shatter and generate high speed shrapnel than cop

SMT p&p new line

Electronics Forum | Wed Jul 19 12:25:47 EDT 2006 | Rob.

Hi Fabione, I'm not being funny, but how did you come up with that choice of machines? There is no way that these set ups are equal in speed or accuracy in the real world. I think you should go back to the drawing board & start again, and depending

  1 2 3 4 5 6 7 8 9 10 Next

speed line searches for Companies, Equipment, Machines, Suppliers & Information

Selective soldering solutions with Jade soldering machine

Benchtop Fluid Dispenser
Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
2024 Eptac IPC Certification Training Schedule

Training online, at your facility, or at one of our worldwide training centers"