Technical Library: vacuum and lga (Page 1 of 1)

Reliability of ENEPIG by Sequential Thermal Cycling and Aging

Technical Library | 2019-04-17 21:29:14.0

Electroless nickel electroless palladium immersion gold (ENEPIG) surface finish for printed circuit board (PCB) has now become a key surface finish that is used for both tin-lead and lead-free solder assemblies. This paper presents the reliability of land grid array (LGA) component packages with 1156 pads assembled with tin-lead solder onto PCBs with an ENEPIG finish and then subjected to thermal cycling and then isothermal aging.

Jet Propulsion Laboratory

Recession survival tips on how and why not to cut training.

Technical Library | 2012-06-01 00:08:44.0

Recession survival tips on how and why not to cut training. ... About the methods for US Manufacturing Industry to adjust for the knowledge vacuum caused by retiring baby boomers with training, while dealing with tight training budgets during a recessio

Business Industrial Network

Moisture and Bubble-Free Material Preparation in Larger Quantities

Technical Library | 2018-09-10 08:44:08.0

Issue: Moisture and bubbles in your dispensing material with larger quantities Solution: Scheugenpflug’s 55-gal Barrel Agitator Station Barrel agitators for casting resins take their technology from the paint sector. They fall short of meeting the special demands of the auto, medical, aeronautics and electronics industries. They can’t guarantee a solid seal on the barrels – often containing expensive, moisture sensitive resins – allowing the humidity of the surrounding environment to damage the material. Also, conventional barrel agitators, as opposed to smaller units, cannot work in a vacuum to process materials directly.

Scheugenpflug Inc.

Dust removal in temperature and humidity Test Chamber (2/2)

Technical Library | 2019-05-21 00:21:26.0

Continue to talk about the dust removal from temperature humidity test chamber. Cleaning and maintenance: 1) Pls remove internal impurities inisde chamber before operation. 2) The power distribution room should be cleaned at least once a year, and the dust can be removed by vacuum cleaner. 3) The exterior chamber must also be cleaned more than once a year, which can be wiped with soapy water. Inspection and maintenance of humidifier: The water storage in humidifier should be replaced once a month to ensure clean water quality, humidifying water tray should be cleaned once a month to ensure smooth flow of water. The inspection of over-temperature protector:during the test: If the temperature is over 20 ℃ ~ 30 ℃ than the maximum value setted,the power supply of the heater will stop, the "OVERHEAT" overt-emperature warning light will automatically turn on but the fan is still in operation, if the equipment runs without operator around,the operator should check the over-temperature protector in advance to ensure wether it has been setted properly before start [wet ball over-temperature protector set to 120 ℃].

Symor Instrument Equipment Co.,Ltd

  1  

vacuum and lga searches for Companies, Equipment, Machines, Suppliers & Information

Best SMT Reflow Oven

World's Best Reflow Oven Customizable for Unique Applications
Selective soldering solutions with Jade soldering machine

High Resolution Fast Speed Industrial Cameras.
SMT Spare Parts

"Heller Korea"