Electronics Forum | Sat Jan 06 10:12:51 EST 2001 | Dave F
Vinyl ESD floor tiles are probably the most expensive approach to "permanent" flooring, about $8 a square installed. VPI and 3M are reputable suppliers. Let me digress on ESD floor "waxes", the earlier poster�s comments are well taken, but the bigge
Electronics Forum | Fri Jan 05 11:42:15 EST 2001 | John
We are planning out an expansion project. Currently we have vinyl esd tile in our production area. We've found this to be expensive, easy to damage, and a pain to repair. Has anyone had any experience with ESD floor coatings/paints??? Any advice
Electronics Forum | Fri Jan 05 13:56:41 EST 2001 | csullivan
We currently use a "wax" ESD coating on our floor. It is cheap and easy to repair. However, the maintenace on it is extensive. It also needs to be re-"waxed" quite often. There are permant coatings out there. I have started to look into these pro
Electronics Forum | Fri Jan 12 09:44:17 EST 2001 | blnorman
Having formerly worked for a solid rocket motor manufacturer, we were extremely concerned with ESD. I'm not sure of the specifics, but all our floors were painted (concrete). All employees in these areas wore steel toed, conductive shoes, to dissip
Electronics Forum | Fri Aug 14 07:52:03 EDT 2015 | mun4o
Hi all, 2 weeks ago we installing a new P&P machine - chip shooter.But , after installation proved that vibration of the new P&P arе very strong.If I use mashine to 100% of the speed the machine vibrating and after 2-3 panels moving 3-5 mm.The machin
Electronics Forum | Thu Aug 27 09:58:45 EDT 2015 | fcmtechnician
Hi Take out the steel plate, is acting like a trampoline, oscillating with the machine movements! Is the machine leveled OK? The installation guys use 0.02/1000 Spirit Level ( leveler )? Let the machine on the concrete floor, try first on the top o
Electronics Forum | Fri Sep 18 07:59:38 EDT 2015 | mun4o
Thanks FCM, we remove the metal plate and make a new ferro-concrete base.Under foot put ESD rubber.Now machine working perfect - without any vibration. Thank you very much and success.
Electronics Forum | Fri Dec 18 12:25:40 EST 2015 | deanm
We are required by AS9100 to keep expired material/chemicals off the floor. Examples include solder paste, flux, adhesives, conformal coating, etc. We have a system in place to prevent such occurrences but once in a while something is not accounted f
Electronics Forum | Thu Jan 07 14:37:41 EST 2016 | hegemon
You might try something simple like the appointment scheduler built into Micrsoft Outlook. Set an appointment to review your material status based on the lead time, say 1 month before expiration. Review supply and demand and order accordingly. Set
Electronics Forum | Thu Nov 10 23:04:47 EST 2005 | davef
Background * The Facilities Manager�s Guide To ESD Flooring Materials http://www.conformity.com/0311the.pdf * Taking The Mystery Out Of Selecting ESD Flooring http://www.conformity.com/0212taking.pdf