Electronics Forum | Fri Jan 18 21:53:25 EST 2013 | armandogomez
What version of software a re you using ? Some older versions of MyPlan have this problem? I have it with mine an is TPSys 2.4.6 and 3.3 MyPlan I cant ever get one right so I just use it as a guideline
Electronics Forum | Sun Feb 17 23:33:08 EST 2013 | mdang
Hi All, Is anyone out there has a CD of the FLEXA 4.6.1? Please let me know. Thanks, -Michael
Electronics Forum | Fri Apr 10 12:44:58 EDT 2015 | bandjwet
Does anyone have a clue as to why lead times are running 4-6 weeks on re-tinning of components? Is there a new spec (besides the JSTD-001F) that is causing for this rush towards re-tinning of components?
Electronics Forum | Sat Oct 03 00:03:29 EDT 2015 | vrasak
Hi All, Can anyone point me to proper place? Thanks Wee vrasak hotmail.com
Electronics Forum | Fri Dec 15 11:01:14 EST 2017 | robertorocco
I have one Topaz X FNC machine with this problem. The head 2 FNC not change the nozzle. The head 4-6-8 is ok and change, but head 2 no, when he tries to change the nozzle he gives me an error message. What could be the problem?
Electronics Forum | Wed Feb 13 20:15:36 EST 2019 | aldrich17
They all rotate on the same belt but, 2 per head on heads 2, 4, 6, and 8. Placed on the front and back. Held by a bracket with 2 screws. But no matter how tight I set the screws upon adjustment they still get out of whack.
Electronics Forum | Wed Mar 17 21:05:01 EDT 2021 | action_101
In need of some Microchip LAN9311-NU and the market is killing us, 4-6 weeks out, production down. If anyone has some of this component unopened in the package and would be willing to sell, please let me know.
Electronics Forum | Tue Feb 21 12:28:17 EST 2023 | tommy_magyar
Hi there, I am using Inertec selective soldering. We do 8 hr shift, 5 days a week, lead-free at 300C - changing nozzles once in 4-6 weeks. Regards, Tom
Electronics Forum | Wed Feb 12 14:33:09 EST 2003 | Ehess
We are in the process of settign up an SMT line with conveyors. When planning for a 4ft conveyor (or 2 or 3ft for that matter), how mush space should I set aside for this? My boss is telling me to leave 4'6" for a 4ft conveyor. I think this is too
Electronics Forum | Sun Jan 17 13:05:33 EST 2010 | smellew
Rodrigo, MCS PC Pin 1 To Pin 2 Pin 4 To Pin 5 pin 6 To Pin 3 Local Links MCS 9 Way Male Link 2 & 8, 3 & 7 PC 9 Way Female Link 7 & 1, 4,6 & 8 If you need anything else let me know Regards Llew