Electronics Forum | Fri Nov 06 08:36:41 EST 2009 | jagadeeshrajagopalan
Martin Pls find the link for the SMT OEE calculator.
Electronics Forum | Thu Aug 01 07:52:37 EDT 2002 | GregH
Are all components calculated at the same cost when calculating cost per placement? Are they categorised according to their sizes / dimensions as per machine placement speed or are they also categorised as per component technology? Can anyone give me
Electronics Forum | Thu Oct 07 05:24:22 EDT 1999 | zambri
I am interested in seeing how some of you calculate machine utilisation. Currently this was calculated off against the uptime. I really believe there is a better way of doing it i.e if I were to calculate this against machine's capacities. Any feedba
Electronics Forum | Thu Aug 01 07:51:04 EDT 2002 | GregH
Are all components calculated at the same cost when calculating cost per placement? Are they categorised according to their sizes / dimensions as per machine placement speed or are they also categorised as per component technology? Can anyone give m
Electronics Forum | Thu Mar 06 09:50:00 EST 2003 | davef
What are the statistical conditions that must be met / checked prior to preforming Cp / Cpk calculations to assure that the calculations are valid?
Electronics Forum | Tue Oct 05 17:47:28 EDT 2004 | mikecollier
We are using the paste vendor's recommendations for TAL, preheat, etc. They do not give any indication on their datasheet for the time to use to calculate slope (calculate over 20 seconds, 60 seconds, etc. - not included in their data).
Electronics Forum | Fri Nov 06 08:04:25 EST 2009 | martinphill
How to calculate Availability in SMT mcs? IDeal Rated CPH or Machine programming time? Pls send me SMT OEE Calculator
Electronics Forum | Thu Aug 18 06:06:07 EDT 2016 | technotronix
Here is a PCBA Warpage calculate method after complete SMT/Through hole assembly Warpage calculation method = warping height / length of the curved edge
Electronics Forum | Thu Oct 07 15:12:19 EDT 1999 | Scott S. Snider
| I am interested in seeing how some of you calculate machine utilisation. Currently this was calculated off against the uptime. I really believe there is a better way of doing it i.e if I were to calculate this against machine's capacities. Any feed
Electronics Forum | Tue Oct 05 20:07:12 EDT 2004 | davef
We do not know how your KIC2000 calculates slope. Here's an approach to calculating slope: * Subtract the lower temperature from the upper temperature. [Temp|upper-Temp|lower] = Temp|change * Subtract the time when the lower temperature was measured