Electronics Forum: load (Page 4 of 163)

AIS3500 on GSM1

Electronics Forum | Thu May 13 17:08:38 EDT 2010 | gregcr

prompt appears hit enter, another prompt should appear. Now set Diagnostic/Run switch to run, start vision system software load. The vision software can not load if the system is in running arbitrary code and hung in a loop so halting the controller

How SMT Line Change over is measured?

Electronics Forum | Wed Feb 20 13:24:56 EST 2013 | dyoungquist

If you stop when the first completed PCB of the next run goes in the oven, wouldn't you be including the loading time for that PCB in your change over time? Wouldn't change over time be from the time your p-n-p machine stops loading the last board o

GSM1 error loading machine model

Electronics Forum | Tue Mar 22 14:50:11 EDT 2016 | ttheis

A friend of mine has a used gsm1 but when loading up UPS it gives an error indicating it did not receive a request to load the machine model in the allotted time. Photo is attached of the message. Any suggestions what to look at? The machine is runni

Load Cell Temperature

Electronics Forum | Sat Jun 29 18:59:43 EDT 2019 | davef

You weren't clear on the type of gauge that you're using. Strain gauge load cells are the most common. These load cells have two gauges. The orientation of the gauges affects cell performance characteristics. * Temperature compensated: Temperature

MPM Accuflex "The PCB Did Not Load" Issue

Electronics Forum | Mon Sep 30 09:40:57 EDT 2019 | proceng1

One thought. Since this machine uses the camera as the board sensor, I've had a metal board support right where the camera sets up to detect the incoming board. Try loading the board after removing all the board supports. If it loads, then try som

Jade S200

Electronics Forum | Sat Dec 31 00:52:33 EST 2022 | sarason

Next step trace the RS232 cable. Check all output voltages on your power supplys, b oth loaded an d unloaded. Note any differences. Check he impedancesa of your loads ie is your 24 volt load only measuring a few ohms. You may have a short? sarason

JaNets - question about smt files for machines

Electronics Forum | Mon Feb 27 11:55:58 EST 2023 | dontfeedphils

It depends on how you plan on loading the programs the next time. I used to always send the programs to the machines from the main IS program, but if you just want to load programs from the machine (assuming your programs don't require updates) then

FUJI Line vs MY15 line

Electronics Forum | Thu May 26 12:21:04 EDT 2005 | stepheniii

We have dek-my12-my12-heller. We are very happy with it. Change-over time varies more by facility than by machine type. I worked at a place with dek-mviif-msf-btu and we had faster changeovers there. There we had a dedicated feeder set-up. Close to

High Mix Low Volume : Beck End Floor Loading

Electronics Forum | Wed Sep 21 05:33:34 EDT 2005 | Selva Govind

It's me again I post it before complete the message. Let me start once again. I plan, schedule and deliver SMT production programs for HMLV plant(app 1200 Assemblies). The kind of floor loading I have here is works great for SMT only. I'm considering

Pick and Place vs CAD File

Electronics Forum | Fri Nov 24 22:32:12 EST 2017 | myke03o

Some Customers normally don't share CAD data in order not to copy the design. What you can do is use the Pick and Place file then plot to the pcb paste/silkscreen layer of the gerber using software. Not sure if your universal machine can load a gerb


load searches for Companies, Equipment, Machines, Suppliers & Information

Selective soldering solutions with Jade soldering machine

Benchtop Fluid Dispenser
Pillarhouse USA for Selective Soldering Needs

Reflow Soldering 101 Training Course
Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

World's Best Reflow Oven Customizable for Unique Applications