Electronics Forum: up and 2030 (Page 4 of 76)

UPS and ROHS Compliance

Electronics Forum | Fri Jan 27 15:39:08 EST 2006 | GS

Thanks Patrick yes I feel better now, but allow me a comment: Reason A: your answer confirms my tough. In general could be accepted Reason B: your answer "The primary function of ups start when electricity is "off" so the equipment is clearly exem

Touch-up and Inspection Process

Electronics Forum | Tue Mar 01 13:51:23 EST 2005 | pjc

pr is 100% correct, can't have visual inspectors touching up for the reason he states. I have always seen that- when in doubt they will always "touch up". Touching up is always a bad thing. Looks like you have some problems that need fixing to elimin

Touch-up and Inspection Process

Electronics Forum | Thu Mar 03 11:23:50 EST 2005 | Slow Ride

Generally QC is a different deptpartment than touch-up people. Most touch-up people are just general operators, so to keep their job they always see the solder joint as "not enough". Q.C. people are generally a bit better, but know they may be call

Touch-up and Inspection Process

Electronics Forum | Sat Mar 05 22:57:32 EST 2005 | gpaelmo

This has been our practice and its worked well: SMT process-QC/Touch-Up-Assembly. We have dedicated QC/T-Up after reflow trained under IPC requirements. They do the SMT inspection and ONLY touch-up if necessary. This way we never have to inspect SMT

X-Outs and Panel Arrays

Electronics Forum | Wed May 14 15:15:03 EDT 2008 | boardhouse

Hi Scott, I have worked for a State side PCB Manufacture and now a Taiwan Manufacture. At both shops the up charge was based on how many up the pallet array was plus layer count and complexity of product, charges ranged from free to 15%. Standa

SMTECH pro's and con's

Electronics Forum | Wed Oct 10 16:50:44 EDT 2001 | jeff

The "UP100 " is currently built by Speedline. However only the models UP100S (No Vision and manual adjust table ) and the UP 100MV (Vision and manual adjust table). These are batch printers not in-line. The IS model has been out of production for ab

UPS and ROHS Compliance

Electronics Forum | Fri Jan 27 09:48:26 EST 2006 | patrickbruneel

GS UPS are exempt for 2 reasons: A. Lead in solders for servers, storage and storage array systems, network infrastructure equipment for switching, signaling, transmission as well as network management for telecommunications. B. The primary functi

Touch-up and Inspection Process

Electronics Forum | Tue Mar 01 10:31:26 EST 2005 | Greg

QC --> Touch-up --> QC --> Assembly After SMT all PWB goes to QC, QC Inspects and marks all that needs rework then PWB's goes to Touch-up to fix what QC marked for rework. After that All reworked boards goes to QC for another verification and stampi

Touch-up and Inspection Process

Electronics Forum | Tue Mar 01 10:43:59 EST 2005 | Rob

Hi Greg, Is anyone logging the errors at QC/touch up stage so they can feed them straight back to SMT and fix them? (i.e. skipped components, poor paste coverage etc) Obviously the faster you spot an error the cheaper it will be for you. Cheers,

UPS and ROHS Compliance

Electronics Forum | Thu Jan 26 18:19:02 EST 2006 | GS

Again talking about Tsunami ROHS......... What about UPS units for small or large Power, do they must be ROHS compliance or not ? Regards.................GS


up and 2030 searches for Companies, Equipment, Machines, Suppliers & Information