Electronics Forum | Fri Jul 31 16:56:46 EDT 1998 | Steve Zweig
Check out www.glenbrooktech.com for x-ray systems
Electronics Forum | Mon Apr 15 18:55:25 EDT 2002 | davef
Use the same size samples all the time, eh?
Electronics Forum | Tue Mar 24 09:48:15 EST 1998 | Steve Schrader
| Do you know if there is an IPC standard or industry standard | that addresses the proper process for handling MSD's in the production environment....? (rework etc.) | Not the receiving area. | Thanks so much, | Robin Arnold | PCB Development | Har
Electronics Forum | Tue Apr 09 16:25:28 EDT 2002 | clarkk
Alan, You're right, mass inspection after assembly won't work. The inspectors will miss 25% (or more) of the defects, and the boards will be reworked before SMT operators can properly define defects and their sources. The company I work for tends to
Electronics Forum | Thu Apr 20 13:02:44 EDT 2000 | Robert Patrick
Hi.... I read your message and can empathize. I just joined PDR Infrared Systems. PDR offers an Infrared System for CSP/UBGA with X-Ray or Optical Inspection Packages. You may want to consider IR technology for UBGA before taking the plunge. Hop
Electronics Forum | Fri Apr 12 15:48:33 EDT 2002 | jersbo
SPC for each assembly(I use C(for board defects)NP(for unit defects) at the end of reflow to determine process capabilities determine Control limits. Once control limits are set, inspectors stop the process until out of control limit is addressed and
Electronics Forum | Mon Apr 15 21:55:46 EDT 2002 | ianchan
Hi Clark, Out of curiousity and in the name of learning new stuff, can you share with us how does your team, calculate the cost of inspection? Is inspection an additional chargable item in the quotation sheet? To quote your posting : "Just a side n
Electronics Forum | Wed Apr 10 10:32:39 EDT 2002 | slthomas
Ask your compadres how you can control a process when it's output has already been completed? If you do second side assembly before you inspect the first side, you can't possibly apply real time corrective action. I know what I'm talking about in t
Electronics Forum | Tue Apr 09 21:40:26 EDT 2002 | ianchan
We are a local enterprise with limited resources, just like you described, so hope this experience sharing helps : we place a production Visual Mechanical Inspection (VMI) inspector at the end of each Reflow Oven area, complete with magnify scope 30
Electronics Forum | Tue Mar 19 13:22:13 EDT 2019 | lapskrfc
Dear all, I'm considering to buy a nice rework station for our lab. We are not gonna do mass production and the smallest components that we will be soldering is in the order of 0201 smd components. Actually, I'm considering the following three machi