Flux application using the DispenseJet® pump is a superior alternative to screen printing and ultrasonic spray. Jet dispensing eliminates the overspray and material waste associated with ultrasonic and spray application methods. Flux application usi
Technical Library | 2019-06-12 10:33:58.0
The success of ball grid array (BGA) placement on electronic assemblies is as much a matter of proper preparation and planning, as it is technique. In some designs, it is more appropriate to apply BGAs using a rework station that isolates the placement of the device, without subjecting the entire assembly to thermal reflow. This is especially beneficial in board constructions where the number of BGAs is limited, and the application of the solder paste is difficult, due to small pitch features that stretch the limitation of the stencil construction. Another application for rework stations, involves very large and thermally conductive BGAs, which will not uniformly reflow with other components on the assembly, and may require special process parameters for their proper placement. The most common use of BGA rework stations are for assemblies requiring BGA removal and replacements due to failures in the initial assembly stage.
Technical Library | 2019-05-30 10:59:13.0
In the current economic environment, the ability to reuse ball grid array(BGA) components that have failed due to solder defects may be an efficient way for electronics manufacturers to reduce costs. Cost may not be the only driving factor in the decision to engage in this recycling practice. The increasing demands placed upon the complexity of microprocessors and integrated circuits (ICs) has decreased the availability of some components, and increased their lead time. Because of this, reballing may provide a means to meet schedule, reduce rework turn-around time, and give a manufacturer a decisive advantage over other companies in an ever increasingly competitive market. This article will discuss the process of reballing BGA components (Figure 1), examining preparation (the preform method, the screen method), and cleaning and bake-out.
Events Calendar | Sun Sep 27 00:00:00 EDT 2020 - Thu Oct 01 00:00:00 EDT 2020 | Rosemont, Illinois USA
SMTA International 2020 Conference & Exhibition
Used SMT Equipment | Pick and Place/Feeders
Samsung Samsung CP45FV-Neo advantages: 1, simple operation, flexible line change: Samsung's CP and SM series Mounter is recognized by the industry's most simple operation of the model, which uses WinXP system, compatible with Gerb files,
Events Calendar | Mon May 04 00:00:00 EDT 2020 - Mon May 04 00:00:00 EDT 2020 | ,
Ball Grid Array Rework - How to Do It Successfully
Industry News | 2010-07-15 14:19:11.0
Now an authorized distributor for Chip Quik products.
BGA component installation demo with the Shuttle Star SV560 that has the Side View Camera option.
Technical Library | 2019-06-07 14:49:54.0
ACI Technologies was contacted in regards to poor solder joint reliability. The customer submitted an assembly that was exhibiting intermittent opens at multiple locations on a ball grid array (BGA) component. The assembly’s functionality did not survive international shipping, essentially shock and vibration failures, immediately making the quality of the solder joints suspect. The customer was asked about the contract manufacturer and the reflow oven profile as well as the solder paste and surface finish used. The ACI engineering staff evaluated the contract manufacturer’s technique and determined that they were competent in the methods they used for placing thermocouples in the proper locations and developing the reflow oven profile. The surface finish was unusual, but not unheard of, in that it was hard gold over hard nickel, rather than electroless nickel immersion gold (ENIG). The customer was able to supply boundary scan testing data which showed a diagonal row of troublesome BGA pins.
Technical Library | 2020-05-08 18:22:31.0
A customer contacted the Helpline to perform analysis on a lead-free assembly which exhibited intermittent functionality. The lead-free assembly exhibiting intermittent functionality when pressure was applied to the ball grid array (BGA) packages. Industrial adaptation of a Restriction of Hazardous Substances (RoHS) compliant solder standard has created a new host of failure modes observed in lead-free assemblies. Pad cratering occurs when fractures propagate along the epoxy resin layer on the underside of the BGA connecting pads. While originating from process, design, and end use conditions, it is the combination of a rigid lead-free solder with inflexible printed circuit board (PCB) laminates that has advanced the prevalence of this condition. Pad cratering is simply the result of mechanical stress exceeding material limitations.