Electronics Forum | Wed Dec 08 08:20:20 EST 1999 | Jerry Stafford
Michael, You need to know the measurement capability of whatever system you use to do your CpK measurement. Ideally you would do an error of measurement study of the measurement process. It is hard to imagine a measurement system that would err on
Electronics Forum | Tue May 13 15:48:43 EDT 2008 | mmjm_1099
Well I figured it out. The XP242 vision system is STUPID. I had to use a vision 18 instead of a 10 because it was seeing a leg.
Electronics Forum | Fri Dec 22 09:39:22 EST 2000 | CAL
Some random Ideas when I read you post...... 1) If it works don't fix it. 2) Be aware of the temp threshold of your components....Over heating components is not good. Over heating is not good period. 3) The Solder paste Chemistry you are using maybe
Electronics Forum | Tue Jan 16 11:40:53 EST 2018 | awelektronik
Hello, i try to programm my vision system from our HS180 to place a Radio-Module (RN2483 from Microchip). On the Visionsystem, the Module are very bright! So i cant teach the leads from the module. I tryed to teach only measuring outline, but somet
Electronics Forum | Fri Oct 03 15:56:04 EDT 2008 | ivanahumpalot
What type of placement machine do you have? How is the machines vision system viewing the part, body x,y only? Do you have the option with the vision system to use just the lead information? Can you use the pin itself for placement from an up look
Electronics Forum | Mon Dec 21 09:56:18 EST 2015 | proceng1
The vision on our semi-automatic printers allows the operator to draw a box around a pad for reference. Then as long as both reference pads are lined up on consecutive boards, it's aligned.
Electronics Forum | Thu Jan 09 18:46:04 EST 2003 | ReworkMAN
The DRS systems are far superior. They don't compete with ERSA or Metcal. The nozzle technology, heaters, and software are so much better. I would find a used DRS22C and use it before those other systems. The vision system in the DRS22 is great
Electronics Forum | Sat Nov 11 03:05:18 EST 2000 | George
I am tasked to breakdown the causes and to report the best reasons why our everytime we download our CAD Data we need to align or adjust our component alignment. Can anyone help me to identify as I do not have enough experience with SMT equipment. Ju
Electronics Forum | Tue Jul 10 08:45:12 EDT 2001 | stefwitt
There are several low cost vision systems ( under $ 5,000) on the market: http://www.dvtsensors.com" ,Keyence, Texas Instruments, Imagenation. If they can capture the image in one shot ( comparing with one good board ) depends on the camera resolutio
Electronics Forum | Wed May 02 11:51:40 EDT 2007 | flipit
Check with Universal on service. The GSM is a solid machine. Very well built. The older machines will run under IBM OS2 OS. Nothing wrong with this OS. There have been some vision system upgrades also. The older GSM might have the AIS3500 or ne
Industrial Sensor Vision International specializes in advanced camera technology of high resolution fast speed cameras for automation, AOI, 2-D/3-D, SPI inspection and wafer inspection.
3 Morse Road 2A
Oxford, CT USA
Phone: +1 203 592 8723