Electronics Forum | Fri Jun 09 07:56:25 EDT 2017 | prdmm1
our company has just purchased the MC110 High-Accuracy Manual Stencil Printer. the only thing I'm not sure about is how to use the PCB Edge Stopper. how is this used? the groove with the stoppers on it is too deep to hold a board because it would s
Electronics Forum | Wed Dec 01 07:48:57 EST 1999 | Steve
Wolfgang, For most of our products, we use a 3-up panel. However for each PCB in this panel we will have a support problem beacuse of the components close to the edge. The framepiece you mentioned - is this something that would come from the PCB su
Electronics Forum | Fri Jun 18 10:56:32 EDT 2004 | Cal
I am looking for some resources and opinions PCB storage racks. Currently, we use the typical oard rack that stands the PCB's up on edge. Q1)Where is a good source to get more of these? Q2)What are the alternatives to this style of board rack? (need
Electronics Forum | Wed Nov 07 02:41:58 EST 2001 | marshall_shuai
Dear Mr. Jeff, Our SMT room are using the DEK288 and MPM2030 Printers at the same time. We found the similar problem also as mentioned by MR.JOHNW. We analysis it was mainly caused by the PCB metal fixture used in DEK288. The PCB metal fixture is
Electronics Forum | Tue Mar 31 12:35:29 EDT 2009 | tpappano
Hi Peter, I forgot to mention that the "locating pins" are on the front conveyor rail, and have conical points that poke partially into the holes in the pcb locking it into position. Also as part of the "locating" arrangement are two more slim pneu
Electronics Forum | Wed Mar 08 17:26:23 EST 2000 | Ron
Depending on the volume of work, it may be less costly and more efficient to have the board vendor add "breakaway" panels to the board to increase it's overall size. This would move the parts away from the edge of the rail, yet would negate the expen
Electronics Forum | Fri Apr 07 11:52:44 EDT 2000 | Ashok Dhawan
Can anyone suggest a cleaning solvent for removing silicon residue after K Tape has gone through 2 cycles of reflow soldering ? The solvent or cleaning method has to be compliant to IPC Standards - to be used for cleaning gold edge fingers - PCB asse
Electronics Forum | Wed Mar 08 17:26:23 EST 2000 | Ron
Depending on the volume of work, it may be less costly and more efficient to have the board vendor add "breakaway" panels to the board to increase it's overall size. This would move the parts away from the edge of the rail, yet would negate the expen
Electronics Forum | Thu Dec 16 06:06:52 EST 1999 | Stefan
Check the print gap and check the clamp edges, sometimes the clamps is damaged causing a distance between the PCB and the screen. Good luck
Electronics Forum | Mon Nov 23 19:20:18 EST 1998 | Kevin
A buddy of mine has problems after depaneling double sided pre-scored PCB's. Resistors near the edge, after put into the slice and dice machine contain micro cracks. He's checked for them before and after depaneling. We figure it is the sectioning
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830