PCBA Time Estimation Formula

Electronics Forum | Thu Feb 20 08:58:43 EST 2020 | klofgren

I'm mostly looking at the time so that I can schedule. Basically I'm looking at running 1000 panels of project A and then 500 of project B. I have a limited time to get a portion of both A and B to the customer. What I am trying to confirm is whether

MPM Momentum Screen Printer Paste Inspection problem

Electronics Forum | Wed Mar 27 13:47:24 EDT 2019 | whitelancer64

I am having an issue with aligning vision for solder paste inspection with the PCB in the Momentum machine. The SMT operators setup the profile on the machine, which I then import into Aegis CircuitCAM to add PCB locations. But when I export again, t

How Quad Align works? (Quad IV-c machine)

Electronics Forum | Fri Aug 02 12:03:16 EDT 2019 | dfl

UPDATE: I was reading around about similar problems. My function #30 always return nozzle height 1. I tried to clean up the glasses and the internal laser lenses, no go, still at height 1. Even after removing both glasses, still at height 1. I saw s

DEK HORIZON 265 Squeege Pressure question

Electronics Forum | Sat Nov 09 19:10:18 EST 2019 | richardcargill

Hi, I just set one of these up a month or so ago, so it's all pretty fresh. The 265s have a pressure sensor amplifier box that needs calibration using the OEM calibration jig. OR you can use a 3 quid digital luggage scale from Ebay. The calibratio

Samtec Searay 500 pin connector solder wicking issue after reflow

Electronics Forum | Tue Jan 14 17:22:16 EST 2020 | emeto

Avillaro, would you say that vapor phase process was selected, because the boards are so thick and heavy? I would assume so. Have you ever tried to run them through reflow oven? To understand better your challenge, we need to understand the setup be

Quad qsv1 plus

Electronics Forum | Mon Jan 20 03:50:37 EST 2020 | falconex_technician

Hi, my company bough second hand pick and place as our second machine. After first transport after start just when initializing, It's showing problem with Z calibration. After second position setup and connect again after month, now showing &

DIP insertion and Axial insertion old equipment poka yoke

Electronics Forum | Fri Jan 31 13:45:49 EST 2020 | slthomas

We had a custom bar code storage and feeder setup. Stores material handlers would bring the parts to the line, scan the part number on the kanban card (always accompanied the parts), and the storage location LED flashed so they knew where the place

Mycronic/Mydata MY19 planning on buying

Electronics Forum | Tue Feb 25 15:28:07 EST 2020 | SMTA-Alex

TPSys is the machine operating system, proprietary from Mydata (Mycronic, now). It's based on Linux. You have to purchase the upgrades from Mycronic. Depending on which version you're upgrading from, the cost might vary. If the machine you're buying

advice on used P&P

Electronics Forum | Fri Jun 26 01:33:32 EDT 2020 | jmelson

> why not get an older essemtec or neoden? I > believe both run on 110V. Thanks so much for the Essemtec hint! Their Fox 1 really looks like it suits my needs! 18 mm component height, 50 um accuracy, small size, what's not to like? I'm go

Need manuals for Samsung CP40 and Philips Eclipse

Electronics Forum | Sun Jun 21 02:43:27 EDT 2020 | jmelson

I'm planning to upgrade my P&P. We had a local auction that included a Samsung CP45FV. I was able to download a NEO manual, it was very well written and the Samsung software looks just incredible for setup and programming the vision system. But, t