SMT Equipment

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv

Name:

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv

Category:

Other

Offered by:

Hebei Changfeng Steel Tube Manufacturing Group Co., Ltd.

Company Information:

Hebei Changfeng Steel Tube Manufacturing Group Co., Ltd.

CFST, as a leader in ERW steel tube industry, has been certified by ISO9001-2008, API 5L and API 5CT and our brand "Changfeng" is listed as national famous brand.

Cangzhou City , China

Contract Manufacturer, Other

  • Phone 86-317-3092830
  • Fax 86-317-3096617

Hebei Changfeng Steel Tube Manufacturing Group Co., Ltd. website

Company Postings:

(22) products in the catalog

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv Description:

Tom Lv

 Hebei Changfeng Steel Tube Manufacturing Co., Ltd
Address:  Cangzhou Economic Development Zone, Changzhou City, Hebei Province, China
Tel: 0086-0317-3092830      Fax: 0086-0317-3096617   Phone number:0086-13754534514   

E-mail: tomlv@changfengsteeltube.com    web:www.changfengsteeltube.com

 
Product Description
Welded Steel Pipe or Tube for Funitures and Construction

1. Welded Pipe Standard: GB/T 13793-2008, JIS G3445, DIN2393, ISO3305, GOST 14162-69, etc.

2. Welded Steel Pipe Material: Q195L, Q195, Q215, Q235, STKM 11A, STKM 12A, St28, A53B, St37-2, etc.

3. Welded Steel Pipes Specification:
A. Outer Diameter: 21mm~273mm(3/8''~10'')
B. Wall Thickness: 0.8 ~ 8.0mm(0.03''~0.4'')
C. Length: 6m or cut as request


4. Certificates: SGS, RoHS, BV, ISO9001-2008

5. Black Welded Steel Pipe Packing Ways:
A. With steel belt in bundle;
B. Oiled and packing by steel belt
C. Oiled with PVC film or waterproof plastic bags


6. Welded Pipe Surface Treatment(if): 
Hot Dipped Galvanized (200~450g/m2) or Pregalvanized(60~120g/m2)



7. Origin of Pipe: China(Mainland)

8. Production Capacity: 50, 000Tons per month

9. Usage of Welded Steel Pipes: Guardrail, fence, clamps, scaffolding, and structural screen, etc.

10. Delivery terms: 10~45 days

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv was added in May 2016

Black Steel Pipe ERW Steel Pipe ASTM A53b ERW Steel Pipe SalesManager: Tom Lv has been viewed 439 times

20 More Products from Hebei Changfeng Steel Tube Manufacturing Group Co., Ltd. :

PCB Manufacturing

Facility Closure