Electronics Forum | Fri Jan 19 08:10:03 EST 2018 | emeto
It should be one of these latches that got stuck in position. I had a similar problem(my200 machine) the other way around - my stays closed so I don't get any vacuum. The problem is that the whole block of latches should be replaced(on a my200 machin
Electronics Forum | Tue Nov 23 02:23:27 EST 2021 | SMTA-64387687
The TM magazines will work exactly the same on the newer machines, as they did on your TP-11. The MY100, MY200, and MY300 series machines are all available with 2 heads, Midas and Hydra.
Electronics Forum | Mon Sep 08 09:34:32 EDT 2014 | cflames17
Anytime before 1pm eastern time today should be good. we have Mycronic installing New My200's this week. He is do to arrive sometime after 1pm. I will be glad to be of assistance.
Electronics Forum | Thu Dec 15 07:28:38 EST 2016 | emeto
Hello experts. Can anyone tell me how to force part to go to Hydra heads on MYDATA machines? I have MY200DX. Especially interested in Electrolytic caps placement.
Electronics Forum | Mon Apr 08 18:16:20 EDT 2024 | mistrthou
We had a Mycronic tech in adjusting rings to get us within spec. He was saying the emitter/receiver board at the top and the tubes themselves can go bad. Between that and having weak latches, we're looking at a refurbished unit. But we're rocking a M
Electronics Forum | Wed Mar 30 19:37:17 EDT 2022 | jzeivel
I have an MY200DX mycronic pick and place machine. I recently started getting this error "F-MOT-MOVENICE HYDRA Theta2/1295: Encoder Signal is noisy". Has anyone else ever had this error? The machine will still run, but this error will pop up rando
Electronics Forum | Thu Jan 05 12:33:30 EST 2017 | rgduval
If you haven't resolved this yet, I think you're going to want to go to either the part or the package (I'm not sure which one off hand), and make sure that the hydra heads/tools are selected for placement. You'll also want the vision set to the lin
Electronics Forum | Tue Apr 25 23:17:52 EDT 2023 | smtusa
So I visited a high tech factory that exclusively used mydata for last 20 years. They started with 1 my9, moved to 3, currently at 8 my200/300s which the whole company was proud of. They love them and credit mydata with the reason they were able to
1 |