Electronics Forum: air and cokpressor (Page 1 of 12)

main air filter of pick and place

Electronics Forum | Mon Sep 18 21:32:11 EDT 2006 | smaintech

Hi! Where can i get an air filter for our pick and place machines?

main air filter of pick and place

Electronics Forum | Tue Sep 19 12:42:32 EDT 2006 | Darren

What type of P&P?

main air filter of pick and place

Electronics Forum | Wed Sep 20 11:30:21 EDT 2006 | pms

Home Depot ...............

floor and air conditioning, shop floor requirements

Electronics Forum | Thu May 02 15:29:19 EDT 2013 | jim_n_hky

I can't answer your specific question on the floor, but I have some suggestions. The equipment manufacturer should be able to provide the floor loading requirements. A structural engineer should be able to translate that into specs for hte constructi

floor and air conditioning, shop floor requirements

Electronics Forum | Mon May 06 05:32:39 EDT 2013 | pavel_murtishev

Jim, Thank you for the input. Could you please check your standard filter pore size? A model number would be valuable. How many shop volumes (in cubic meters) do you pump per hour? Customer is seriously thinking over installing AC system similar to

floor and air conditioning, shop floor requirements

Electronics Forum | Tue May 07 07:31:15 EDT 2013 | davef

Pavel You're correct that you should consider the point loading of your placement, wave and other machines. I've put shops above the ground floor of buildings. Equipment suppliers are the best source of information about these requirements. BR, dav

floor and air conditioning, shop floor requirements

Electronics Forum | Wed May 15 11:13:36 EDT 2013 | pavel_murtishev

Davef, Could you tell me if you filled your floor by additional concrete layer during your shop construction? Have you had any placement machines stability issues? Your input would be really valuable. Thank you.

floor and air conditioning, shop floor requirements

Electronics Forum | Tue Apr 30 05:05:16 EDT 2013 | pavel_murtishev

Colleagues, Now I am involved into plant ramp-up where 3x Panaconic NPM-W will be installed. New production hall is being designed right now and the problem is that constructors have never met SMT shops and know very few or next to nothing about requ

floor and air conditioning, shop floor requirements

Electronics Forum | Mon May 06 21:40:40 EDT 2013 | davef

ANSI/J-STD-001: * Temperature and Humidity: 18-30°C, 30-70%RH ** If out of range, shall verify electrostatic discharge control program according to ANSI/ESD S20-20 is adequate. ** For process control, more restrictive temperature and humidity limits

floor and air conditioning, shop floor requirements

Electronics Forum | Tue May 07 03:56:30 EDT 2013 | pavel_murtishev

Davef, Thank you. I wonder if you have ever faced with concrete layer thickness selection for SMT shops? All I have found refers to metal treatment shops (primarily milling & drilling). 6" concrete is thick enough for them to stabilize milling machi

  1 2 3 4 5 6 7 8 9 10 Next

air and cokpressor searches for Companies, Equipment, Machines, Suppliers & Information