Electronics Forum | Thu Aug 21 14:39:50 EDT 2008 | johnhburris
We have been running a 2060 (along with a 2050) for about a year. Great machine; good follow up to the 700 series, of which we run several variants. We have a 2 shift, 5 day operation with 7 changeovers/shift. We've minimized downtime by building fee
Electronics Forum | Tue Feb 04 21:07:16 EST 2014 | sarason
You should ask yourself a bunch of questions before you consider going down this path. The first being where are the bottlenecks in your existing line and is there anything you can do to eliminate or decrease there bottleneckness (made up word). I
Electronics Forum | Mon Aug 19 13:16:15 EDT 2002 | kenbliss
Some things to consider 1. can one operator keep up with manual operations and not slow the line down? If yes, great. If no you will need a way to allow more than one operator access to the next board coming down the line to not create a bottleneck.
1 |