Electronics Forum: comparator (Page 131 of 153)

Re: Work in Process

Electronics Forum | Thu Feb 24 21:44:27 EST 2000 | Dave F

Horace: Area you in the rainy or the dry portion of the South? ;-) Now, excuse me from mincing words with you ;-) �, but buying a manufacturing software package is a serious (expensive) endeavor that will leave no part of your company unscathed. I�d

Re: Equipment/Line Capability Study

Electronics Forum | Tue Sep 26 20:14:29 EDT 2000 | Dave F

I agree with Wolfgang that a check list, like he proposes, is very useful in evaluating your ability to assemble products. No sense designing a 16 inch board if the throat of your wave is 15 inches. Taking a different tact � what if you define your

Re: Equipment/Line Capability Study

Electronics Forum | Tue Sep 26 20:16:07 EDT 2000 | Dave F

I agree with Wolfgang that a check list, like he proposes, is very useful in evaluating your ability to assemble products. No sense designing a 16 inch board if the throat of your wave is 15 inches. Taking a different tact � what if you define your

Re: DFM / DFT information - Darn unmasked!

Electronics Forum | Fri Jul 14 16:29:12 EDT 2000 | Dave F

Awww John, if I typed all that folderol, my spell checker would have gone kaaablewee!!! Most of the stuff I listed is tactical, because I assume most people on the forum are DFM / DFT choir and by the time we get involved, some BIG $$$ consultant ha

Re: DFM / DFT information - Darn unmasked!

Electronics Forum | Fri Jul 14 16:29:31 EDT 2000 | Dave F

Awww John, if I typed all that folderol, my spell checker would have gone kaaablewee!!! Most of the stuff I listed is tactical, because I assume most people on the forum are DFM / DFT choir and by the time we get involved, some BIG $$$ consultant ha

Re: Work in Process

Electronics Forum | Thu Feb 24 21:44:27 EST 2000 | Dave F

Horace: Area you in the rainy or the dry portion of the South? ;-) Now, excuse me from mincing words with you ;-) �, but buying a manufacturing software package is a serious (expensive) endeavor that will leave no part of your company unscathed. I�d

Contract Manufacturer's warranty policy

Electronics Forum | Wed Mar 21 09:31:39 EST 2001 | CAL

Susan - Thank you for providing more information. It is hard just to give a rule of thumb on warranty time. Comparing other contract manufactures is also misleading. I have seen 30 days to 10 year warranties from contract manufacturers. Here are some

I had a nightmare

Electronics Forum | Thu Jun 28 08:14:11 EDT 2001 | Stefan Witte

I visit customers on a contract base to get the machines in a status, that an operator can take over. These customers are usually small shops, who can not effort an engineer to set up the machines. I am not afraid of my job, if it does not require a

Contamination test

Electronics Forum | Mon Jul 30 21:03:44 EDT 2001 | davef

You should specify the level of res based on the effect of the res on the end-use of the product. J-STD-001 defines cleanliness requirements for ALL flux types, including water soluble and no-clean that you mention. 1 There is no equivalency betwee

Re: Buying stenciling and pick and place equipement.

Electronics Forum | Mon Dec 20 13:39:08 EST 1999 | Wolfgang Busko

Hi Clarissa, seems to be a real start up situation you are in. For the printing there is IMO no need to buy any sophisticated automatic-vision-alignment-self-cleaning-inline-and-more-machine. Features you need: - adjustable in X-,Y-,Z-axis (individu


comparator searches for Companies, Equipment, Machines, Suppliers & Information

PCB Handling Machine with CE

Reflow Soldering 101 Training Course
thru hole soldering and selective soldering needs

Training online, at your facility, or at one of our worldwide training centers"
2024 Eptac IPC Certification Training Schedule

High Throughput Reflow Oven
High Throughput Reflow Oven

High Resolution Fast Speed Industrial Cameras.