Electronics Forum | Wed Sep 30 15:27:34 EDT 1998 | jvo
I've been looking for a vision system which can check our fully mounted boards containing a mix of smt and thru hole. The concepts on all the machines are virtually the same, they got about 12-16 cameras, some pcb fixing and the rest is software.
Electronics Forum | Wed Sep 30 16:36:59 EDT 1998 | Dana R Simon
I've been looking for a vision system which can check our fully mounted boards containing a mix of smt and thru hole. | | The concepts on all the machines are virtually the same, they got about 12-16 cameras, some pcb fixing and the rest is soft
Electronics Forum | Wed Sep 30 18:44:43 EDT 1998 | Steve Gregory
Hi JVO, I just learned about a system from a company called CR technology... (there's still more I need to find out). But supposedly, they make a machine called the CRX2000 that is both a real-time xray and AOI machine all rolled into one. Wh
Electronics Forum | Mon Jan 17 10:40:11 EST 2000 | Dave F
Cost = Labor + Production Materials + Overhead Cost = Labor * Overhead Multiplier Cost = (Time For Task*Labor Rate*Benefits) * Overhead Multiplier Cost = ((6sec/3600sec/hr)*$10/hr*1.3) * 2 Cost = $0.04
Electronics Forum | Mon Jul 23 13:26:23 EDT 2001 | Hussman
Yes, by the component is a start. There is also board cost, and process material costs, engineering costs if needed, pallet cost if needed, and packaging costs. Inspection and test are another part of the cost. Will you provide your own test-set?
Electronics Forum | Mon Aug 30 20:32:37 EDT 2010 | davef
So let's see, Cost of Ownership = [[Equipment cost + Setup]+[Operating costs]] / [Yield*Throughput*Utilization], where 'Operating costs' include: chemicals, water, electricity, DI tanks, filters, recycling costs, etc.
Electronics Forum | Wed Aug 09 18:31:11 EDT 2000 | Doug Teeter
Can anyone tell me the cost or estimated cost of soldering BGA's to the PCB (per package, per ball)?? Also, is there a similar cost for Rework
Electronics Forum | Wed May 17 16:02:53 EDT 2000 | Mark J. Braska
Is there any data on the total cost of labeling PC boards. Included in this cost would be the labels, ribbons,printers & maintenance,software, and engineering & operator expenses(fully burdened). I am searching for an independant analysis of the co
Electronics Forum | Wed Oct 17 10:48:12 EDT 2001 | davef
First layer costs this ..., each additional layer multiplier is ..., holes upto this ... size cost ..., nomenclature costs ..., etc.
Electronics Forum | Mon Mar 07 22:20:56 EST 2005 | rf
I'm doing some research into some various costs for defects and work stoppages in an SMT environment. Specifically, I'm interested in what are the costs for a company to rework defective boards...from easiest to hardest component but not to include c