Electronics Forum | Tue Jun 01 16:12:49 EDT 2004 | gregf912
The 10k rebuild does not need to be applied every 3-4 months as previosly stated. A cp machine that is running 100% of the time on a 24/7 basis will tack up 10k hours in 12.4 months. Now we all know that this is impossible due to parts shortages, pro
Electronics Forum | Thu Jun 10 16:23:11 EDT 2004 | davem
Hi Grant, In previous positions I've had experience with the Fuji CP43, CP6, CP642, CP643, CP65, IP3 & QP242. In operating, training and process engineering capacities. Presently, I'm working with 2 SMT lines (in a process engineering capacity) wit
Electronics Forum | Tue Oct 12 10:24:22 EDT 2004 | sdsmt
i worked with cp6s in 1995 and 1996. we always had missing part problems that was machine related. we had to inspect every board for missing parts. it was a disaster, imho, but i expect a chipshooter to consistently load chips. otherwise, it was