Electronics Forum: gsm1 and 4681 (Page 1 of 2)

Looking for ex field engineer for uic gsm1 and gsm2 machines

Electronics Forum | Sat Jul 09 11:15:48 EDT 2011 | temelyucel

we are looking for ex field engineer for uic gsm1 and gsm2 machines

Looking for ex field engineer for uic gsm1 and gsm2 machines

Electronics Forum | Wed Jul 27 13:41:55 EDT 2011 | mmjm_1099

I am looking for one in the Wisconsin area. I have a GSM1 I purcahsed and need sonmeone to come in get it up and running so I can resell it on the used market.

Looking for ex field engineer for uic gsm1 and gsm2 machines

Electronics Forum | Fri Jul 15 15:26:42 EDT 2011 | vickt

what region? and to contract or for hire?

Looking for ex field engineer for uic gsm1 and gsm2 machines

Electronics Forum | Thu Jul 28 20:19:14 EDT 2011 | edwaterfall01

Ex UIC FE (15 years) available for service work on all GSMs. If interested we can arrange to discuss further.

Board Handling Error: Waiting for output board transfer to complete, on GSM1 4681A UIC

Electronics Forum | Thu Jul 28 17:35:45 EDT 2016 | travishemen

We have similar machines and they will give errors like this if the adjustable sensor on the unload end is over the fixed or movable rail.

Board Handling Error: Waiting for output board transfer to complete, on GSM1 4681A UIC

Electronics Forum | Thu Jul 28 15:43:48 EDT 2016 | ddina

Recently started setting up our GSM 4681A system, and one of the machines comes up with the message "WAITING FOR OUTPUT BOARD TRANSFER TO COMPLETE" after the Zeroing process has been started. Machine has all the defaults set, two SMEMA connected univ

Board Handling Error: Waiting for output board transfer to complete, on GSM1 4681A UIC

Electronics Forum | Fri Jul 29 17:41:35 EDT 2016 | ddina

I appreciate your response. I kind of read about it, and made sure nothing sensor-wise is activated by mistake on the process of zeroing. Right now the machine is in this set up, and the rear rail is all the way to the back stop. So the sensor on the

Universal GX-11S and Pneumatic Feeders?

Electronics Forum | Tue Apr 25 20:22:32 EDT 2023 | ttheis

We have a line running GSM1 machines and we are considering upgrading to GX-11S machines with FJ3 heads. Does anyone know if the GX-11S machines can take pneumatic feeders from the GSM machines? We have a very large inventory of the pneumatic and ele

Placement Equipment and Long Boards

Electronics Forum | Mon Apr 09 10:16:14 EDT 2007 | davef

Pick and place: * Fuji: The largest pcb size is 20" by 18" for pick and place; 18"x14" for chip shooters. Fuji NP XL series allows 27 by 23 inch boards using a conveyor. * MYDATA has machines that can be configured to 34" X 44" X 0.500" * HSP 4796A a

foot print of an MV2V and GSM2

Electronics Forum | Mon Jun 11 11:31:53 EDT 2007 | ratsalad

According to our plant drawings: MV2VB 23' 8" X 6' 11" GSM1 8' 6" X 5' 6" A GSM2 should be the same size as a GSM 1.

  1 2 Next

gsm1 and 4681 searches for Companies, Equipment, Machines, Suppliers & Information

best pcb reflow oven

Stencil Printing 101 Training Course
Gordon Brothers October 2-30, 2024 Auction

Software for SMT placement & AOI - Free Download.
Win Source Online Electronic parts

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
PCB Handling with CE

We offer SMT Nozzles, feeders and spare parts globally. Find out more
Gordon Brothers October 2-30, 2024 Auction

Reflow Soldering 101 Training Course