Electronics Forum | Mon Jul 04 11:32:44 EDT 2005 | geb
One of my Universal GSM (1995/ 1996 model) pick and place machines has recently started to drop the nozzle on the reject belt when dropping off a rejected component. I have tried replacing the nozzel holders on the ends of the spindles but with no im
Electronics Forum | Wed Jul 22 05:54:41 EDT 2015 | langkeauto2015
Hi, Tsvetan, sorry for your bad experience for Chinese brand PNP machine. For your doubt, pls refer to my comment:) Our pnp machine is special for led tube, led panel, led strip, RGB strip, and led display screen PCB, and real working speed feedbacke
Electronics Forum | Sun Jul 19 23:19:47 EDT 2015 | langkeauto2015
We are one of the leading manufacturer of high speed led pick and place machine from Shenzhen ,China, during the communication with our foreign clients, we found that, many USA clients want desktop pnp machine ,rather than high speed model, we are wo
Electronics Forum | Wed Jul 22 07:20:12 EDT 2015 | spoiltforchoice
I'm not entirely sure that is accurate. The only people who want small 'desktop' machines are hobbyists/labs who are unable to accept the costs and time constraints placed upon them by a subcontractor and think they can do better themselves. Standalo
Electronics Forum | Sat Jul 17 15:22:17 EDT 2004 | rohman23
Thanks for all the responses. I do agree with what was said, and can certainly see reasons not to try. I'll write a little more about what we do. We are a defense contractor, and as I mentioned very high mix, low volume. We only have 1 SMT line.
Electronics Forum | Sun Aug 31 16:16:37 EDT 2014 | spoiltforchoice
Andres, I think if you were to understand the process a little better you would realise the many many problems you would encounter building even very simple things using your method. Even 30 minutes watching Youtube videos of current machines might h
Electronics Forum | Mon May 13 02:14:04 EDT 2019 | tsvetan
All these generalizations are non sense. What real cph you will receive depend on many factors: - paths optimization - what number of feeders are used - what number of nozzle changes has your job - how fast is the recognition for small and big part
Electronics Forum | Mon Dec 29 16:49:57 EST 2014 | emanuel
Hi Rob, I am writing this reply as an update. Unfortunately I got your recommendation a bit too late, I contacted Count-On Tools and ordered from them a custom made nozzle for the Emerald. $300 paid for the "pleasure", everything could be OK if it w
Electronics Forum | Fri Dec 10 12:40:44 EST 1999 | Brian W.
It sounds like the process is very labor intensive, and all the verification is done after the parts are soldered. Assuming you are hand placing the components: 1 - Contact Systems semi-automatic placement machine. It show polarity when placing, so
Electronics Forum | Thu Sep 12 16:17:07 EDT 2002 | soupatech
There seems to be less play in the pocket than with other parts i've loaded. I was assuming the large nozzle would work better but for reasons unknown to me it didn't. I also tried a 1mm and had parts all over the machine (can you say hand place 100+
A dealer of high quality Used SMT Equipment, Used Plastic Injection Molding Equipment, Used Machine Tools, Used Semiconductor Machinery, and Used Industrial Machinery.
Equipment Dealer / Broker / Auctions
104 East Street
Middleton, MA USA
Phone: 978 790-2774