Electronics Forum | Fri Dec 05 19:43:43 EST 1997 | Mike Clader
I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the orig
Electronics Forum | Sun Mar 29 22:55:06 EST 1998 | Yoshi Kuni
| I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the or
Electronics Forum | Sat Mar 14 08:33:39 EST 1998 | Rudy
| I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the or
Electronics Forum | Sat Mar 14 08:28:28 EST 1998 | Rudy
| I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the or
Electronics Forum | Mon Dec 08 09:25:02 EST 1997 | Scott McKee
| I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the or
Electronics Forum | Sat Dec 06 11:01:25 EST 1997 | Arulvanan
| I would like to hear from anyone producing high mix (~200 modules) with low volumes (5-2000 per year) using an automatic line running lot sizes in the 5-50 range. We are engaged in an investigation to invest in this capability. A view into the or
Electronics Forum | Fri May 17 11:00:57 EDT 2002 | Sam Chiocca
Demand Wave Solutions has an inventory control module, BOSSgoldIC, that can be integrated with your present ERP system or implemented individually on an open architecture platform. It is on-line, interactive inventory management system that provides
Electronics Forum | Mon Nov 24 11:24:34 EST 2003 | Bill
Sorry for the long delay in response.. As it turns out, the float switch on our transfer station was gummed up (probably by the defoamer residue) and allowed the transfer station to get behind (backing up the gravitational flow of the wash system).
Electronics Forum | Thu Jan 19 04:35:35 EST 2006 | pavel_murtishev
Good day, I worked with Maratnz some time ago. My own opinion is that this is limited machine with limited functions. Main disadvantages are: - Rather costly, something about 100 KEUR per table top machine; - 2D scanning system (direct light module
Electronics Forum | Mon Jan 04 15:40:31 EST 2010 | dilogic
We recently got a job where (after placing SMT parts) we have to solder LED dot-matrix 8x8 display modules manually on the pcb. Due to the PCB design, it has to be TH type (also, it's the only type available) and soldered manually (or using selective