Electronics Forum | Tue Jul 18 11:32:40 EDT 2006 | Joris Groot koerkamp
I am wondering what skills operators need to run an smd line itself. At our company they know how the pick&place machine works (refill/ changover), but if there is a problem with wrong placed components they don't known what to do. Our managmenttea
Electronics Forum | Tue Jul 18 19:09:12 EDT 2006 | SWAG
Our lines have operators on all shifts capable of doing programming start-to-finish and can deal with almost any program related problem. We are high mix, low volume. Our builds are sometimes one of a kind with qauntities of 20 or 30. We empower a
Electronics Forum | Fri Mar 31 14:18:52 EST 2000 | Garth Fitzner
PS. My e-mail has been operating sporadically of late so if your e-mail to me please try sending it to fitzner@compusmart.ab.ca or please call me toll free at 1-800-617-7384. Garth
Electronics Forum | Sat Aug 21 11:45:15 EDT 2004 | dror
hello i am a stundent from israel, i work in a smt company, and my assignment is to reduce stup in the smt line. i need a flow chart of the assignment operators have to do during a setup for a pcb manufacture. or any other material i can use to reduc
Electronics Forum | Tue Jul 18 16:40:09 EDT 2006 | dphilbrick
We have a system where when we set up the line to run a job before the first part is placed an auditor verifies we have all the correct parts loaded on the machines in thier correct locations. We then run a first article. The board is inspected to in
Electronics Forum | Fri Aug 27 15:09:08 EDT 2004 | Charlie
Hello, Take a look at some of the automatic tooling options that are available. These can dramatically reduce changeover time. These systems are available through many of the equipment manufactures like DEK, Ekra, Universal, Assembleon and others.
Electronics Forum | Fri Sep 10 00:02:14 EDT 2004 | Darren
Dror, If I understand your question correctly, you would like to know what the operators should be doing in what priority during setup or changeover? Simply stated if you are doing on line setup due to limitations in feeder quantity or manpower avail
Electronics Forum | Fri Mar 31 14:09:16 EST 2000 | Garth Fitzner
I am looking for someone who has knowledge on the operation of a Quad 100. I want to bring that person in on a contract basis to train my staff. My facility is located near Edmonton, Alberta so ideally the right person would be in the western Canad
Electronics Forum | Sat Aug 21 16:29:39 EDT 2004 | Slava
Hi Dror, I also work in Israel in smt field. We get the info from the offline optimizer and arrange it in the following way: element - machine no - f/r - place (for example 100nf - 3F34) Elements are placed in abc order, so it is easier to find it
Electronics Forum | Tue Jul 18 15:47:07 EDT 2006 | Mark
IPC610 training to help verify issues that might arise. Also, the opeators need to know part numbers and descriptions because that should be common knowledge when running a SMT line. Plus, with your comment "At our company they know how the pick&plac