Electronics Forum: packages (Page 71 of 288)

PGA, uBGA, CSP, FC - Technology

Electronics Forum | Mon Feb 02 09:05:36 EST 2004 | pjc

http://www.tessera.com/library.cfm http://www.tessera.com/technologies/technologies.cfm Tessera also has sheets on the construction of these advanced packages.

LGA design

Electronics Forum | Wed Feb 11 08:04:16 EST 2004 | autissier

I'm looking for input from anyone who has experience assembling the LGA package on PCBs. Design, stencil opening, or other requirements are welcoming

BGA rework

Electronics Forum | Fri Mar 19 07:06:27 EST 2004 | george

Vijay: If you are still having difficulty or are frustrated with your yields try http://www.solder.net. They work on the most difficult packages and boards.

BGA WARRANTY

Electronics Forum | Mon Mar 08 15:59:51 EST 2004 | mrmaint

Looking for warranty information on BGA packages. Specificaly what type of warranty if any, after reballing and reinstalling the BGA. Does reflow more than 2 times void this. Thanks MrMaint

MSD classification

Electronics Forum | Thu Apr 01 12:44:06 EST 2004 | Chris Lampron

Laxman, JEDEC J-STD-033A has a bake time/temp table based on different package thicknes.

TSOP 44 type II

Electronics Forum | Tue May 04 13:11:17 EDT 2004 | Rob

Does any one can send me land pattern recommendation for package TSOP44 type II please. Rob

Hyper BGA and Super BGA

Electronics Forum | Tue Jul 06 19:45:03 EDT 2004 | ANDREW

Based on the attchment it looks like both are low profile and cater for high IO point.What are the challenges in running this 2 type of component?Is there any additional process required other than normal SMT for these 2 packages,like underfill ?

Hyper BGA and Super BGA

Electronics Forum | Wed Jul 07 18:36:17 EDT 2004 | russ

We place both of these packages on a regular basis and experience no issues. Just run 'em like any other BGA. Russ

HIC turn Pink for PCB-URGENT

Electronics Forum | Tue Jul 06 05:33:46 EDT 2004 | ANDREW

1)What is the MSD level for PCB? 2)I have some PCB's with HIC (humidity indicator card ) has turn to pink at 50%. Should I bake the PCB prior to assembly process.This fab is a complex board with various kind advance package assembled on the board.

Mirrored BGA Assembly

Electronics Forum | Fri Jul 16 03:40:17 EDT 2004 | Rama

We are going to start producing product that require us to assemble Stacked BGAs. My question - how to rework this package, as the the process of either removing or re-placing them onto the PCB will the effect the BGA sitting on top of it. Pls help.


packages searches for Companies, Equipment, Machines, Suppliers & Information

Electronics Equipment Consignment

World's Best Reflow Oven Customizable for Unique Applications
Selective soldering solutions with Jade soldering machine

High Precision Fluid Dispensers
Pillarhouse USA for Selective Soldering Needs

High Throughput Reflow Oven