Electronics Forum: production (Page 171 of 870)

Production Line Setup

Electronics Forum | Wed Jun 19 04:54:45 EDT 2002 | ianchan

Nuez : u mean u put an operator to check the placement mounting of components, juz before the PCBA enters the reflow oven? how does that release the bottlenecks for efficiency rates? pls explain, coz we want to learn from your experiences. Thanks.

pcb plating

Electronics Forum | Thu Jun 13 15:33:49 EDT 2002 | john

I opened a two product boxes which are similar and have PCBs. The PCB in one box is gold plated. Can anyone explain why it needs gold plating? Thanks in advance

Drying PCBoards

Electronics Forum | Wed Jul 03 02:15:02 EDT 2002 | fogel

Need some info regarding the terms and conditions of drying bare boards before the assy. process (if need it at all). We encountered latly with delimination in some boards and I'm not sure that it is a product failure.

Managing Production Schedules

Electronics Forum | Thu Jul 18 08:49:00 EDT 2002 | Mark S.

Our company started with a MSAccess based system for reporting labor time and displaying a schedule of jobs to build. Now we have created an intranet based schedule that displays the production schedule, short materials, maintenance schedule, feeder

Panel/Pallet Separating with Interconnects

Electronics Forum | Fri Jul 19 13:33:25 EDT 2002 | gdstanton

Dave, fyi...we decided not to go with the interconnects. At least during development phase due to excessive NRE to support the effort. However, we may revisit this when we come to production phase. Gregster

Wave Pallet Lifespan

Electronics Forum | Mon Jul 15 18:29:55 EDT 2002 | russ

Are you talking about selective wave pallets? Most of it depends on the minimum thickness of masking walls (design). I have had some that have lasted until the product went EOL (5000 passes or so. and some have made it about 50 passes. How's that

Key Production Indicators

Electronics Forum | Thu Jul 18 11:11:35 EDT 2002 | davef

Universal Instruments charts five barriers to success 1. Nonconforming material reports 2. Parts shortages 3. Configuration changes 4. Miscellaneous - rework, software changes 5. Assembly errors

Key Production Indicators

Electronics Forum | Thu Jul 18 14:58:54 EDT 2002 | mark_susol

Well I'm sure I'm not the only who has this experience but even when things are going really well..you never realize 100% of what the machine says you SHOULD be able to do. So what I look at is the labor start time & stop time of the WO and the tot

Key Production Indicators

Electronics Forum | Mon Jul 29 09:36:59 EDT 2002 | pjc

From the time the last board from "Job A" exits the oven until the first board from "Job B" exits the oven.

APS Equipment Users

Electronics Forum | Wed Jul 24 17:52:11 EDT 2002 | Garth

Looking to make contact with other users of equipment manufactured by Automated Production Systems (specifically their new L Series Pick and Place machines) who may be intersted in forming a users group. You can contact me at sales@garnetinstruments.


production searches for Companies, Equipment, Machines, Suppliers & Information

Selective soldering solutions with Jade soldering machine

World's Best Reflow Oven Customizable for Unique Applications
Equipment Auction - Eagle Comtronics: Low-Use Electronic Assembly & Machining Facility 2019 Europlacer iineo + Placement Machine  Test & Inspection: Agilent | Tektronix | Mantis Machine Shop: Haas VF3 | Haas SL-20 | Mult. Lathes

High Precision Fluid Dispensers
PCB Handling Machine with CE

High Throughput Reflow Oven