Electronics Forum | Mon May 19 10:35:58 EDT 2008 | samir
I agree with RealChunks. The application of any of these "wave solder process control tools" is dependant on how the shop is run. At some shops, PM is inconsistent and slacked off on. At other shops, there is no technical expertise at the operator
Electronics Forum | Thu May 29 14:43:58 EDT 2008 | rgduval
We charge a flat rate that covers Programming, Documentation, and Engineering fees. We arrived at the number by estimating an average time spent on these activities over a period of about a year. I lifted this method from a company that I used to w
Electronics Forum | Fri Jun 20 01:12:50 EDT 2008 | chrispy1963
Look into a used Siemens F-4 or F-5. These machines can be had for a reasonable cost, they are easy to maintain, the footprint is small (7' X 7.5') and they are simple to program. These machines have a 12 nozzle "Star" revolving placement head for
Electronics Forum | Fri Jun 20 09:20:04 EDT 2008 | ampearl
I need a technical specialist to turn-on, trouble-shoot, modify, repair, and test the power supply prototypes at the printed circuit assembly and instrument levels. This person would be involved in setting up both manual and automated tests, making m
Electronics Forum | Mon Jun 23 13:01:54 EDT 2008 | wschulz
Hey guys, My company is currently looking into developing a SMT line. I have an interesting perspective on this due to the fact that I worked a SMT line for quite a few years as an equipment operator. Now I am an engineer and at a different company
Electronics Forum | Fri Aug 22 15:27:13 EDT 2008 | wayne123
this is the order that I use. 1. Teach pcb origin 2. Teach fiducial location 3. dial in vision on fid in mark info. 4. go into mount and verify that the primary image is on in x/y (after perfoming a teach trace condition) and then do any offsetts if
Electronics Forum | Mon Aug 25 14:55:51 EDT 2008 | grics
I have a question for the manufacturing masters... We are going to start running test trials/DOE of a Urethane Coating (Humiseal 1A33) and I am not sure what to expect. From what I understand, urethane coating is pretty difficult to work. It is supp
Electronics Forum | Fri Sep 26 09:47:34 EDT 2008 | kevslatvin
I hope this doesn't add any confusion. I save my data as a .csv file and bring that into Cad2cad. This is how I was shown to do it by Assembleon. To use .csv you have to set your file format on the format cad file tab(during import to Cad2cad) to Cha
Electronics Forum | Mon Oct 06 15:04:26 EDT 2008 | mikesewell
I've installed both (at different companies),currently a MPM 125 user. The DEK seemed slightly easier to program a new board. I guess it depends on which platform you're most familiar with. The Hawkeye inspection we had is fast to setup but doesn'
Electronics Forum | Tue Oct 14 19:03:54 EDT 2008 | diesel_1t
currently we have a new Horizon 02i, new software "instinctive" is pretty easy to program and operator friendly, i love to work with proflow. Gridlock is not working so good as they told. I don't like that the paper doesn't roll while you're under cl