Electronics Forum: setup (Page 106 of 161)

MPM AccuFlex

Electronics Forum | Tue Mar 25 08:35:49 EST 2003 | pjc

AccuFlex is the replacement for UltraPrint 1500. UP1500 is going obsolete. AccuFlex was desgigned for fast setup and changeovers and takes some tasks away from the operator. The UltraPrint 2000 was designed for high production, even though many users

Attrition

Electronics Forum | Wed Apr 09 15:05:45 EDT 2003 | russ

Probably of no help but here it is anyway This is a tuff one. Attrition is due to many factors. You have machine rejects (visual fail, no pick), feeder set-up loss each time a reel is removed you lose X number of parts depending on feeder design (w

Voids in solder fillet

Electronics Forum | Thu Apr 17 16:43:09 EDT 2003 | davef

Background: * Bulwith, Ronald A., �Failure Analysis of Solder Joints�, �Insulation/Circuits� magazine, February 1978 * Banks, Donald R., et al., �The Effects of Solder Joint Voiding on Plastic Ball Grid Array Reliability�, Proceedings of the Technica

Skewed transistors

Electronics Forum | Mon Apr 21 17:13:04 EDT 2003 | jonfox

I remember from my days of machine setups that these packages' CAD data is actually off center from where the placement needs to be. Usually CAD center comes up with the parts more to the large collector/ground pad so the the smaller gull wing leads

Contract manufacturing Question

Electronics Forum | Fri May 30 17:05:57 EDT 2003 | jonfox

Back from my days at a CM, the setup fee was only used for first time customers. Basically this was to ensure that if the relationship was to be permanent, all data formats, documentation, and special issues were taken care of. This requires extra

MPM Accuflex

Electronics Forum | Fri Oct 03 08:42:36 EDT 2003 | m4040

This is probably the most advanced machine that MPM has EVER offered. It operates in a Windows 2000 environment, which means plug and play networking. Both setup for new boards and 2D are VERY easy to set up. Most new board programming can be done of

H-551 Aqueous Wash Electrovert question

Electronics Forum | Mon Nov 24 11:24:34 EST 2003 | Bill

Sorry for the long delay in response.. As it turns out, the float switch on our transfer station was gummed up (probably by the defoamer residue) and allowed the transfer station to get behind (backing up the gravitational flow of the wash system).

World Class First Time Yield

Electronics Forum | Sat Dec 27 01:32:42 EST 2003 | Ian Chan

IMHO, depending on whether its a regular run model, or a properly designed/setup pilot run model, getting a mean 75%-95% First Pass Yield (FPY%) is possible as a benchmark target. This is derived from your manufacturing history capabilities, and requ

AP 25Hie

Electronics Forum | Tue Jan 13 23:44:23 EST 2004 | fastek

If I may clarify something as to not give the wrong idea. As a used equipment dealer my focus is on the cost of ownership only for myself and the buyer at the entry point. I was assuming (perhaps incorrectly) from the gentleman's statement that the m

121-BGA

Electronics Forum | Fri Jan 16 07:06:47 EST 2004 | Mika

Component manufacturer often have recommendation for pad layout and process setup. This should be used as a guideline to help You to set up the process. Exactly what type of component is this, uBGA? We populate 64 I/O uBGA's on our pcb's with 0.3 mm


setup searches for Companies, Equipment, Machines, Suppliers & Information