Electronics Forum: smt line speed (Page 1 of 236)

smt line - floor requirements

Electronics Forum | Fri Aug 14 07:52:03 EDT 2015 | mun4o

Hi all, 2 weeks ago we installing a new P&P machine - chip shooter.But , after installation proved that vibration of the new P&P arе very strong.If I use mashine to 100% of the speed the machine vibrating and after 2-3 panels moving 3-5 mm.The machin

smt line - floor requirements

Electronics Forum | Fri Sep 18 07:59:38 EDT 2015 | mun4o

Thanks FCM, we remove the metal plate and make a new ferro-concrete base.Under foot put ESD rubber.Now machine working perfect - without any vibration. Thank you very much and success.

smt line - floor requirements

Electronics Forum | Thu Aug 27 09:58:45 EDT 2015 | fcmtechnician

Hi Take out the steel plate, is acting like a trampoline, oscillating with the machine movements! Is the machine leveled OK? The installation guys use 0.02/1000 Spirit Level ( leveler )? Let the machine on the concrete floor, try first on the top o

YesTech F1 speed

Electronics Forum | Fri Jul 19 14:51:24 EDT 2013 | rway

So what AOI system are you using and what auto-insertion equipment is on the line?

YesTech F1 speed

Electronics Forum | Fri Jul 19 10:19:01 EDT 2013 | rway

We have inline reworkers, so this time has been factored in. We currently use Siemens S25/20 machines with M1 systems. The placement machines run a little slower than the AOI at times so there is time to perform review, most of the time. It's not

YesTech F1 speed

Electronics Forum | Thu Jul 18 18:32:18 EDT 2013 | rway

Hello all, I was wondering who out there has an F1 or F1-5 system used at post-paste. If so, what type of auto-insertion equipment are you using on that line and what is the cph placement capability. Does your F1 system keep up with the cycle time

YesTech F1 speed

Electronics Forum | Fri Jul 19 12:58:13 EDT 2013 | rway

The review time varies depending on the product. But it could take anywhere from 10s to over a minute depending. That doesn't leave much time left on this new line. What AOI are you using now and with what equipment?

YesTech F1 speed

Electronics Forum | Fri Jul 19 14:54:41 EDT 2013 | dontfeedphils

I suppose I worded that poorly, we run a B2 bench-top unit later on in the process (QA area to be exact) so it isn't in line with anything and doesn't have to keep up with anything feeding it upstream. And we run Juki equipment.

SMT line validation

Electronics Forum | Wed Feb 22 12:40:41 EST 2006 | russ

Here are some of the things we had to do when we had to validate process. Incoming voltage Air pressure squeegee speed placement accuracy oven stability

SMT p&p new line

Electronics Forum | Thu Jul 20 11:28:40 EDT 2006 | Rob

Mydata are OK, but they will not last as long as the Siplace if running the same volume. They are easy to programme, change over & upgrade - they are very good entry level machines. One thing to remember is that they make use of large scale gang pi

  1 2 3 4 5 6 7 8 9 10 Next

smt line speed searches for Companies, Equipment, Machines, Suppliers & Information

KingFei SMT Tech
KingFei SMT Tech

Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab

Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider

3 Road Xintang, Fuhai Street,Fuyong
Shenzhen, 30 China

Phone: 13713862102