Electronics Forum | Thu Oct 21 12:02:05 EDT 2010 | kjs123p
My company is trying to develop a system to take into account the SMT parts scrapped by the machine and also the parts lost during loading and unloading feeders. This is causing part shortages for us. I would appreciate if anyone could share how th
Electronics Forum | Tue Jun 01 16:12:49 EDT 2004 | gregf912
The 10k rebuild does not need to be applied every 3-4 months as previosly stated. A cp machine that is running 100% of the time on a 24/7 basis will tack up 10k hours in 12.4 months. Now we all know that this is impossible due to parts shortages, pro
Electronics Forum | Thu Jan 15 11:47:55 EST 2009 | rgduval
We do this quite regularly. In fact, it's a core part of our business. And we do it with a single shift. How do we do it? With a strong assembly staff, comprised of people who have a lot of experience working in the engineering prototype space.
Electronics Forum | Thu Mar 08 05:49:11 EST 2001 | Dreamsniper
Hi, We are encountering a shortage on our parts and our purchasing said that the parts, which is in PLCC packaging, is hard to order from the local and international market and we can only get them in QFP packaging. Now the problem enters here. Our P
Electronics Forum | Mon Oct 19 23:02:21 EDT 1998 | john godfrey
| We have just recently started using the Overall Equipment Effectiveness (OEE) metric on our SMT lines. This measurement is the "equivalent percentage of time the equipment is being used to produce saleable product at the maximum machine rate." Th
Electronics Forum | Fri Oct 26 11:34:44 EDT 2001 | pteerink
Paul, Many variables that affect changeover, here's a few to start with: 1) Feeder count- do you have enough feeders to be able to do a complete setup off-line? Take your product that uses the most amount of feeders, and make sure you have at least
Electronics Forum | Fri Sep 15 15:50:54 EDT 2006 | Steve
Good info, Russ. I'm glad we aren't the only ones that go to extra lengths to use up short strips of parts, both kitted and our own supplied parts. The tought part is making the call to throw out the left-overs since the operators generally don't kno
Electronics Forum | Sun Mar 14 00:15:45 EST 2010 | dcell_1t
Well, not really... the index does not say much by itself, as you say, you can improve your cycle time by 5% but if you don't update the product rate in your calculation, then you're not providing accurate data so your performance is going to be high
Electronics Forum | Fri Mar 16 16:58:52 EST 2001 | davef
A most evocative title to the tread, Ed. Few companies in Joysee named "C-Tech", eh? I assume we�re talking "C TECH is a distributor of low vision aids and adaptive technology for the blind, visually impaired and learning disabled." [http://www.lowv
Electronics Forum | Tue Nov 10 12:43:13 EST 1998 | Dave f
| What are you people using to store component reels and tubes in? I am looking for a cabinet with slots or something to store reels and tubes. We keep our components on the production floor near the machines. The cabinets we are using now are ver
1 |
Main Products: 1. Original new and Original Used SMT/AI Spare Parts. 2. SMT Equipments And Related Machine( SMT Calibration, SMT Feeder Carts,Conveyer etc.) 3. Maintenace and Repair Service Pre-Sales Service Provide details ab
Manufacturer's Representative / Manufacturer / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
Building A, Jiepeng Square, Fuyong
Shenzhen, Chad
Phone: 0755-33578694