Electronics Forum: topaz and operational and error (Page 1 of 3)

JUKI KE2060R and KE2060L

Electronics Forum | Mon Sep 21 04:23:16 EDT 2009 | smtbox

R series Features FCS (Flex Calibration System) highly regarded easy maintenance just got even easier! The optional FCS calibration jig is a simple to use system to re-calibrate placement accuracy. The machine automatically picks and places jig comp

AXI and AOI

Electronics Forum | Tue Jul 09 15:20:19 EDT 2002 | pjc

When you look at the capabilities of Combo machines they tend to sacrifice performance when compared to separate X-ray and AOI machines, meaning they don't do either the X-ray or AOI operations as well as a machine that was designed to do only one. A

New Pick and Place Operation

Electronics Forum | Fri Jun 04 20:08:13 EDT 2004 | Ken

Rick P. is the Assembleon local Field Service Engineer. He is very good. He is stationed in the Portland Metro area. Oregon and Washington have a very dense population of Philips (assembleon) machines. Extensive installation base. I recently in

New Pick and Place Operation

Electronics Forum | Fri Jun 04 00:51:15 EDT 2004 | fastek

Ken...you are right on the money. I couldn't imagine someone new to SMT assembly getting themselves involved with such an old platform. Besides I would have my doubts that a Quad 4C can even handle what this guy would want it to do. 0402's on a 20 ye

Re: SMD Inspection and Touch-up

Electronics Forum | Mon Jul 26 10:44:08 EDT 1999 | Boca

| There is a practise within the industry of an Inspector inspecting a board, and that same Inspector performing touch-up. My opinion is that the Inspection and Touch-up operations should be separate functions whereby the Inspector is not performing

Re: SMD Inspection and Touch-up

Electronics Forum | Fri Jul 23 13:49:29 EDT 1999 | Bob Neverosky

| | There is a practise within the industry of an Inspector inspecting a board, and that same Inspector performing touch-up. My opinion is that the Inspection and Touch-up operations should be separate functions whereby the Inspector is not performin

Fuji Pick and Place Machines

Electronics Forum | Tue Jun 01 16:12:49 EDT 2004 | gregf912

The 10k rebuild does not need to be applied every 3-4 months as previosly stated. A cp machine that is running 100% of the time on a 24/7 basis will tack up 10k hours in 12.4 months. Now we all know that this is impossible due to parts shortages, pro

ICT and specifying PCBA testing

Electronics Forum | Fri Nov 18 12:35:15 EST 2011 | rway

As the article eludes to, you still need probe access to measure the pins with TestJet. One thing I wanted to add was the use of JTAG for use with Boundary Scan. Certain devices have JTAG capability, but not all JTAG devices are Boundary Scan compa

First Off and P+P Data

Electronics Forum | Wed May 25 17:58:07 EDT 2011 | rssimmons

The SimmScope is a first article inspection system that uses an overhead digital microsope on a motorized gantry to inspect the board - much like an AOI - except that it does not automatically make the pass/fail decisions. It is up to the operator to

Re: SMD Inspection and Touch-up

Electronics Forum | Fri Jul 23 23:47:03 EDT 1999 | Scott McKee

| | | There is a practise within the industry of an Inspector inspecting a board, and that same Inspector performing touch-up. My opinion is that the Inspection and Touch-up operations should be separate functions whereby the Inspector is not perform

  1 2 3 Next

topaz and operational and error searches for Companies, Equipment, Machines, Suppliers & Information

2024 Eptac IPC Certification Training Schedule

Training online, at your facility, or at one of our worldwide training centers"
Win Source Online Electronic parts

World's Best Reflow Oven Customizable for Unique Applications
2024 Eptac IPC Certification Training Schedule

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
SMT Machines

Stencil Printing 101 Training Course
Electronic Solutions R3

Thermal Transfer Materials.