• SMTnet
  • »
  • Technical Library
  • »
  • Design for Testability (DFT) to Overcome Functional Board Test Complexities in Manufacturing Test

Design for Testability (DFT) to Overcome Functional Board Test Complexities in Manufacturing Test

Published:

June 20, 2018

Author:

Louis Y. Ungar

Abstract:

Manufacturers test to ensure that the product is built correctly. Shorts, opens, wrong or incorrectly inserted components, even catastrophically faulty components need to be flagged, found and repaired. When all such faults are removed, however, functional faults may still exist at normal operating speed, or even at lower speeds. Functional board test (FBT) is still required, a process that still relies on test engineers’ understanding of circuit functionality and manually developed test procedures. While functional automatic test equipment (ATE) has been reduced considerably in price, FBT test costs have not been arrested. In fact, FBT is a huge undertaking that can take several weeks or months of test engineering development, unacceptably stretching time to market. The alternative, of selling products that have not undergone comprehensive FBT is equally, if not more, intolerable....

  • Download Design for Testability (DFT) to Overcome Functional Board Test Complexities in Manufacturing Test article
  • To read this article you need to have Adobe PDF installed

June 26, 2018

Manufacturers test to ensure that the product is built correctly. Shorts, opens, wrong or incorrectly inserted components, even catastrophically faulty components need to be flagged, found and repaired. When all such faults are removed, however, functional faults may still exist at normal operating speed, or even at lower speeds. Functional board test (FBT) is still required, a process that still relies on test engineers’ understanding of circuit functionality and manually developed test procedures. While functional automatic test equipment (ATE) has been reduced considerably in price, FBT test costs have not been arrested. In fact, FBT is a huge undertaking that can take several weeks or months of test engineering development, unacceptably stretching time to market. The alternative, of selling products that have not undergone comprehensive FBT is equally, if not more, intolerable....

You must be a registered user to talk back to us.

 
Company Information:

A.T.E. Solutions, Inc.

The leading Test, ATE and Testability consulting and educational firm, offering various test related courses. Maintains the BestTest Directory, a test community knowledge base. Publishes The BestTest eNewsletter.

Los Angeles, California, USA

Repair/Rework, Service Provider, Test Services, Training Provider

  • Phone 310-822-5231
  • Fax 310-305-7703

A.T.E. Solutions, Inc. website

Company Postings:

(3) products in the catalog

(2) technical library articles

(3) news releases

  • Apr 27, 2018 - Understanding the Heat Output of your BGA Rework Station | Precision PCB Services, Inc
  • Apr 27, 2018 - Hot Air vs. IR BGA Rework Stations | Precision PCB Services, Inc
  • Feb 22, 2018 - Hand Soldering with Lead Free Alloys | Metcal
  • Dec 07, 2017 - Utility of Dual Applicators for Non-Atomized Conformal Coating to Improve High-Volume Manufacturing Optimization | Nordson ASYMTEK
  • Nov 08, 2017 - Void Reduction in Reflow Soldering Processes by Sweep Stimulation of PCB Substrate | kurtz ersa Corporation
  • Browse Technical Library »

Design for Testability (DFT) to Overcome Functional Board Test Complexities in Manufacturing Test article has been viewed 523 times

  • SMTnet
  • »
  • Technical Library
  • »
  • Design for Testability (DFT) to Overcome Functional Board Test Complexities in Manufacturing Test
Smart Factory Starter Kit - KIC

Custom Conformal Coating Masks