BGA Placement on Rework Station

Published:

June 12, 2019

Author:

ACI Technologies, Inc.

Abstract:

The success of ball grid array (BGA) placement on electronic assemblies is as much a matter of proper preparation and planning, as it is technique. In some designs, it is more appropriate to apply BGAs using a rework station that isolates the placement of the device, without subjecting the entire assembly to thermal reflow. This is especially beneficial in board constructions where the number of BGAs is limited, and the application of the solder paste is difficult, due to small pitch features that stretch the limitation of the stencil construction. Another application for rework stations, involves very large and thermally conductive BGAs, which will not uniformly reflow with other components on the assembly, and may require special process parameters for their proper placement. The most common use of BGA rework stations are for assemblies requiring BGA removal and replacements due to failures in the initial assembly stage....

  • Download BGA Placement on Rework Station article
  • To read this article you need to have Adobe PDF installed

You must be a registered user to talk back to us.

 
Company Information:

ACI Technologies, Inc.

ACI, an authorized IPC Training Center operating the National Electronics Manufacturing Center of Excellence providing analytical testing, manufacturing and repair services to the electronics industry.

Philadelphia, Pennsylvania, USA

Consultant, Design, IPC Standards Certification Center, Service Provider, Training Provider

  • Phone 610 362 1200
  • Fax 610 362 1290

ACI Technologies, Inc. website

Company Postings:

(24) products in the catalog

(50) upcoming training courses

(61) technical library articles

(3) news releases

  • Apr 14, 2020 - Reliable Selective Soldering For High Volume Assemblies | ITW EAE
  • Apr 14, 2020 - Stencil Printing 008004/0201 Aperture Components | ITW EAE
  • Apr 14, 2020 - Selective Solder Fine Pitch Components On High Thermal Mass Assembly | ITW EAE
  • Mar 12, 2020 - IPC Apex Expo 2020 Remarks | SMTnet
  • Feb 26, 2020 - Dispensing EMI Shielding Materials: An Alternative to Sputtering | Nordson ASYMTEK
  • Browse Technical Library »

BGA Placement on Rework Station article has been viewed 293 times

SMT Spare Parts and Feeders

IPC Training & Certification - Blackfox