Electronics Forum | Fri Dec 08 10:24:11 EST 2006 | pjc
The Speedline Technologies- Electrovert AquaStorm 200 is one machine that can do the trick. You'll need the Chemical Isolation option for the RMA flux and you'll need a cleaning chemistry like what Zestron and Kyzen have. Yes, hi-density boards with
Electronics Forum | Fri Jul 18 12:16:06 EDT 2014 | island2013
I had the same situation at a facility a few years ago. We moved our wash from one building to another and it was fine for months and then we had the foaming issue similar to yours. We tried everything from adding anti foam agents to even having th
Electronics Forum | Fri Feb 28 10:32:45 EST 2003 | pjc
Cookson Electronics Equipment- Electrovert AquaStorm 200 highly recommended options: Checkmate Conveyor Hurricane Jets in Wash and Rinse 4 Additional Top Spray Bars in Wash *Closed Loop Filtration System for Wash *Positive Displacement Chemical Meter
Electronics Forum | Mon Oct 02 10:22:13 EDT 2006 | SteveH
We are having issues with cleaning underneath leadless chip carriers due to their extreme low lying nature and I wondered if anyone else had any experience of this. Our process for years has been vapour degreasing with Triklone N, which works, but w
Electronics Forum | Fri Jul 18 15:25:19 EDT 2014 | davef
The presence of agitation at an air / solution interface and a foaming agent causes foaming. Most water soluble fluxes contain surficants. Surficants are foaming agents. First, it's likely this foaming is caused by poor control of the temperature of
Career Center | THRISSUR, India | Maintenance,Production
HANDLING OF MAINTENANCE Camelot,Mascot, Selective Soldering,Wave Soldering,Aquastorm 200,H-500 HI-Z,Kolb,kerry&PBT,GETECH, ATI 105 & Final Touch 101,Heller,Btu&vapour phase,Shuttle,SRT,ESD ,Electrical maintenance . Knowledge in using SLIM KIC 2000&
Career Center | Parañaque, Philippines | Maintenance
JOB DESCRIPTION Preventive Maintenance Execution of Preventive Maintenance activities, using the following frame work: Machine Cleaning, Inspection, Lubrication, Repair, Replace and Calibration. PM Documentation PM Master schedule PM Checklist Wo