Electronics Forum | Fri Jul 30 14:53:01 EDT 1999 | Tom B.
Hello Netters, I have a customer who wants us to aquaeos wash a PCB after all operations have been performed. The PWB is two layer FR4 with a Transformer, a Multichip Module with Conformal Coating, (6) 11" insulated wires that are tinned on exposed
Electronics Forum | Mon Feb 23 05:37:23 EST 2009 | emmanueldavid
Necoleta, PWB Blistering/De-lamination may not be due for Titanium finished threads / holders which is typically being used to draw high Shelf Life of Pallets and even flow across Auto Wave Soldering rails. There is also nothing to suspect on Liquid
Electronics Forum | Mon Jan 06 17:37:54 EST 2014 | hegemon
Make sure you are providing an adequate moisture bake out prior to wave soldering. It sounds moisture related since is so random. I would suggest perhaps 120C for a minimum of 8 hours to drive the moisture out, and then complete your wave soldering
Electronics Forum | Fri Jul 30 19:58:28 EDT 1999 | ScottM
| | | Hello Netters, | | | | | | I have a customer who wants us to aquaeos wash a PCB after all operations have been performed. The PWB is two layer FR4 with a Transformer, a Multichip Module with Conformal Coating, (6) 11" insulated wires that are
Electronics Forum | Tue Jul 31 15:33:30 EDT 2007 | gregs110
I have seen a few threads about delamination issues on IS410 laminate in RoHS applications. I have recently been running into a rash of issues on 4 different part numbers with a single PWB source. All the parts have been built fine in the past with
Electronics Forum | Thu Oct 26 13:26:53 EDT 2000 | ptvianc
Hello: 1. Yes, it is necessary to reball a PBGA after removal from the board. Once the part has been removed, the quantity of solder on the balls is out of control. This condition will not only result in an unacceptable variation in solder quantity
Electronics Forum | Wed Apr 23 19:00:39 EDT 2008 | stevek
It depends on the laminate but a PWB is like any other MSL component. Some fab shops are only waranting standard FR4 laminates for 45-60 days when processed at lead free temperatures. The best thing I can say is to try some weight gain/loss experim
Electronics Forum | Sat Aug 03 07:29:20 EDT 2002 | davef
IPC-PE-740 "Troubleshooting for Printed Board Manufacture and Assembly" has words to the effect of � 1.5---BAKING Laminate materials are baked several times during the manufacture of a printed wiring board. There are four major reasons for
Electronics Forum | Tue Dec 09 09:46:31 EST 2008 | lazzara55
SMT-ypw: Do you have information about IPC D-35 for reference? B3: The D-35 is a subcommittee responsible for developing industry guidelines on the proper handling, shipping and storage of printed boards and printed board assemblies. Moisture is a ma