Industry Directory: bga shorting during rework (4)

KSM Superclean Ltd

Industry Directory | Manufacturer

KSM Superclean Ltd manufacture a range of contact cleaning machines and hand held systems to remove micro-contamination from substrates before any critical process. www.ksmsuperclean.com

JMVT Labs.

Industry Directory | Consultant / Service Provider

Specialised in Prototyping Assembly/Rework

New SMT Equipment: bga shorting during rework (28)

Unisoft ProntoVIEW-MARKUP - Assembly CAD Viewer & Gerber Viewer Software

Unisoft ProntoVIEW-MARKUP - Assembly CAD Viewer & Gerber Viewer Software

New Equipment | Software

ProntoVIEW-MARKUP is assembly CAD Viewer & Gerber Viewer software used by electronics manufacturers to quickly find components, pin, shorts between traces, etc.  ProntoVIEW-MARKUP is also a redline tool that allows annotation of the assembly to creat

UNISOFT Corporation

PCB Rework, PCB Repair Services

PCB Rework, PCB Repair Services

New Equipment | Rework & Repair Services

On the cutting edge of technology, we offer a full line of high tech services to assist contract manufacturer's and  product  research and developers.  Specializing in quick turn around times to help get your product to market on time. Training Serv

Precision PCB Services, Inc

Electronics Forum: bga shorting during rework (303)

BGA's shorting

Electronics Forum | Wed Oct 03 12:02:04 EDT 2001 | kjwaskow

We are getting solder blobs forming in open areas of the BGA, between the center array and outer array. THe ceter array balls are starved of solder, so they are presumably the source. The theory we hold is possible moisture causing the solder to mo

BGA rework

Electronics Forum | Sun Mar 07 19:58:03 EST 2004 | praveen

Hello , Can any body help in solving the problem of PCB warpage during BGA rework. I am using IR heating system. No problem found in reworking BGA's size less than 30mmx30mm but for 35 mmx35mm and above BGA get solder short due to PCB warpage. Note

Used SMT Equipment: bga shorting during rework (1)

Manncorp RW1210

Manncorp RW1210

Used SMT Equipment | Repair/Rework

Manncorp RW1210 SMT / BGA Rework Station Vintage: 2014 1.3 Million Pixel, High-Definition, Split-Vision Optics with 230x Joystick-Controlled Zoom High-Resolution 15" Full Color LCD Display for Simultaneous, Superimposed Viewing of Component Leads

Assured Technical Service LLC

Industry News: bga shorting during rework (128)

Electropac Montreal Buys New Equipment

Industry News | 2003-06-18 08:04:27.0

Recently purchased and installed a new DP-1500-2X Dual-Sided Photoimageable Ink Coater from Circuit Automation

SMTnet

How to Prevent Solder Joint Voiding and Cold Solder Defects during the SMT Reflow Process

Industry News | 2018-10-18 08:17:09.0

How to Prevent Solder Joint Voiding and Cold Solder Defects during the SMT Reflow Process

Flason Electronic Co.,limited

Parts & Supplies: bga shorting during rework (8)

Fuji Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine

Fuji Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine

Parts & Supplies | Pick and Place/Feeders

Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine Smt fuji nozzles models: FUJI NXT NOZZLE H01 PLACING HEAD Part Number Description AA0AS00 Nozzle 1.0 AA06800 Nozzle 1.3 AA0HL00 Nozzle 1.8 AA0HM00 Nozzle 2.5 AA0HN00

KingFei SMT Tech

Fuji Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine

Fuji Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine

Parts & Supplies | Pick and Place/Feeders

Smt Fuji NXT H01 nozzles 1.0 nozzle AA0AS00 used in pick and place machine Smt fuji nozzles models: FUJI NXT NOZZLE H01 PLACING HEAD Part Number Description AA0AS00 Nozzle 1.0 AA06800 Nozzle 1.3 AA0HL00 Nozzle 1.8 AA0HM00 Nozzle 2.5 AA0HN00

KingFei SMT Tech

Technical Library: bga shorting during rework (2)

StencilQuick™ Lead-Free Solder Paste Rework Study

Technical Library | 2007-01-31 15:17:04.0

The goal of this project is to evaluate the reliability of lead-free BGA solder joints with a variety of different pad sizes using several different BGA rework methods. These methods included BGAs reworked with both flux only and solder paste attachment techniques and with or without the use of the BEST stay in place StencilQuick™. The daisy chained test boards were placed into a thermal test chamber and cycled between -25ºC to 125ºC over a 30 minute cycle with a 30 minute dwell on each end of the cycle. Each BGA on the board was wired and the continuity assessed during the 1000 cycles the test samples were in the chamber.

BEST Inc.

Lead-Free BGA Rework-Transition Issues

Technical Library | 2007-08-16 13:34:31.0

While experienced inspectors may be able to determine the aesthetic differences between a lead-free PCB assembly and a tin-lead version, one cannot rely on the "experienced eye". "Less wetting out to the pad edges" (Figure A) and "graininess and lack of shininess of the solder joint" (Figure B) are typical comments about some lead-free solder joints. However, in cases where a Nitrogen atmosphere was present during the reflow of the solder joint (Figure C), there will be little visual differences between the lead free alloys and their tin-lead counterparts.

BEST Inc.

Videos: bga shorting during rework (20)

Precision PCB Services, Inc. Introduces Side View Camera for BGA Inspection

Precision PCB Services, Inc. Introduces Side View Camera for BGA Inspection

Videos

Amid the COVID 19 crisis, Precision PCB Sevices, Inc. remains open and cable to provide quick turn BGA Rework and Reballing Services with offices in Northern Californa and Dallas, Texas. Today are introducing our new Side View Camera for BGA Rework

Precision PCB Services, Inc

Chip Off 620 BGA Rework Station

Chip Off 620 BGA Rework Station

Videos

One unit currently in stock for immediate shipment. Ships from California. The Chip Off Model 620 SMD Rework System features touch screen operation and programming, upper and lower spot hot air heaters, ceramic coated area heaters, HD Split-Vision

Precision PCB Services, Inc

Training Courses: bga shorting during rework (4)

Non-Destructive BGA/Area Array Component Rework - Technical Workshop

Training Courses | | | PCB Rework and Hand Soldering Courses

The PCB rework and hand soldering courses courses cover techniques of rework and repair of PCBs, BGAs and other electronics assemblies, and teach fundamentals of soldering of electronics assemblies.

PACE Worldwide

BGA Rework/Profiling Training Course

Training Courses | | | PCB Rework and Hand Soldering Courses

The PCB rework and hand soldering courses courses cover techniques of rework and repair of PCBs, BGAs and other electronics assemblies, and teach fundamentals of soldering of electronics assemblies.

BEST IPC Training

Events Calendar: bga shorting during rework (1)

Webinar: BGA and Area Array Process Defects - Causes & Cures

Events Calendar | Tue Feb 12 00:00:00 EST 2019 - Tue Feb 12 00:00:00 EST 2019 | ,

Webinar: BGA and Area Array Process Defects - Causes & Cures

Surface Mount Technology Association (SMTA)

Career Center - Jobs: bga shorting during rework (3)

Packaging Engineer

Career Center | Sherman, Texas USA | Engineering,Production,Research and Development,Technical Support

SMT Packaging Engineer: Location: Texas - Sherman , TX Group: HVAL Degree Requirements: BS ME/ChemE/Materials The person in this position will have the ability to make very significant financial contributions to TI because this is a very critic

Texas Instruments

Assembler 2 – IPC 610 – 1st Shift

Career Center | Oldsmar, Florida USA | Engineering,Maintenance,Production

Job Title: Assembler 2 – IPC 610 – 1st Shift Address: 3655 Tampa Rd, Oldsmar FL 34677 Duration: 1 year Pay Rate: $15-$18 Hours: 9/80 schedule Monday – Thursday 6:00AM – 3:30PM, Friday 6:00AM to 2:30PM Job Description: Use microscope to verify

Lockheed Martin Corporation

Career Center - Resumes: bga shorting during rework (13)

Global Product Specialist

Career Center | Singapore, Singapore | Engineering,Production

I am a result/goal-oriented engineer with 20 years of experience in Surface Mount Technology (SMT) environment, of which 7 years were heavily involved in field service and field application for Automated Optical Inspection (AOI) machines. I partici

SMT Process Engineer

Career Center | Fremont, California USA | Engineering,Production

4 years of PCB assembly process.

Express Newsletter: bga shorting during rework (872)

SMT Express, Issue No. 3 - from SMTnet.com

SMT Express, Issue No. 3 - from SMTnet.com Volume 1, Issue No. 3 Wednesday, August 18, 1999 Featured Article Return to Front Page BGA REWORK Earl Moon Proof Of Design (POD) COMPARE PART SQUARENESS TO BOARD'S SILK-SCREEN OR TRACES A part

Partner Websites: bga shorting during rework (35)


bga shorting during rework searches for Companies, Equipment, Machines, Suppliers & Information

Sm t t t t t t t t t t net
  1 2 3 4 5 6 7 8 9 10 Next