Events Calendar | Thu Oct 03 00:00:00 EDT 2019 - Thu Oct 03 00:00:00 EDT 2019 | ,
IPC Tech Ed Webinar Series: Ball Grid Array (BGA) and Bottom Termination Component (BTC) Design and Assembly Challenges: Reflow Profiling to Achieve Low Defect Rates and Successful Assembly! – Part 2
Technical Library | 2019-06-12 10:33:58.0
The success of ball grid array (BGA) placement on electronic assemblies is as much a matter of proper preparation and planning, as it is technique. In some designs, it is more appropriate to apply BGAs using a rework station that isolates the placement of the device, without subjecting the entire assembly to thermal reflow. This is especially beneficial in board constructions where the number of BGAs is limited, and the application of the solder paste is difficult, due to small pitch features that stretch the limitation of the stencil construction. Another application for rework stations, involves very large and thermally conductive BGAs, which will not uniformly reflow with other components on the assembly, and may require special process parameters for their proper placement. The most common use of BGA rework stations are for assemblies requiring BGA removal and replacements due to failures in the initial assembly stage.
Used SMT Equipment | X-Ray Inspection
CR Technology Model Number: CRX2000 Serial Number: 1S1878.0100 Year 2000-2001 Hamamatsu Tube Type -130kV X-Y-Z indexing table with joystick control 18" x 24" X-Y travel Full 360 degrees rotation and tilt up to 90 degrees BGA / Flip Chip Sold
Events Calendar | Tue Feb 12 00:00:00 EST 2019 - Tue Feb 12 00:00:00 EST 2019 | ,
Webinar: BGA and Area Array Process Defects - Causes & Cures
Amid the COVID 19 crisis, Precision PCB Sevices, Inc. remains open and cable to provide quick turn BGA Rework and Reballing Services with offices in Northern Californa and Dallas, Texas. Today are introducing our new Side View Camera for BGA Rework
Industry News | 2023-08-03 11:31:37.0
PCB/BGA Rework and Training Facility now in Plano, Texas
Used SMT Equipment | Pick and Place/Feeders
Yamaha YV100xg placement machine parameters High-speed, high-precision, multi-functional modular placement machine 0.18 seconds/CHIP ultra-high-speed placement (best conditions) 16200CPH (grains/hour) In the IPC9850 state, the patch speed is as high
Technical Library | 2019-05-30 10:59:13.0
In the current economic environment, the ability to reuse ball grid array(BGA) components that have failed due to solder defects may be an efficient way for electronics manufacturers to reduce costs. Cost may not be the only driving factor in the decision to engage in this recycling practice. The increasing demands placed upon the complexity of microprocessors and integrated circuits (ICs) has decreased the availability of some components, and increased their lead time. Because of this, reballing may provide a means to meet schedule, reduce rework turn-around time, and give a manufacturer a decisive advantage over other companies in an ever increasingly competitive market. This article will discuss the process of reballing BGA components (Figure 1), examining preparation (the preform method, the screen method), and cleaning and bake-out.
Industry News | 2018-07-16 17:50:00.0
Side View Camera now available with all BGA Rework Stations
Industry News | 2011-05-17 11:04:30.0
High Yield BGA Reballing Simplified