The answer to this lies within the datasheets of the components on the board. Each component has its own specs as far as number of heat cycles, time at reflow, peak temperature, whether it can be washed, etc. You do not need to be as thorough on th
Electronics Forum | Tue Jun 07 19:05:52 EDT 2022 | duchoang
First Article Inspection is always a MUST in SMT Process. If possible AOI would be added. We also have second operator/inspector to check on pick&place machine setup and use a program printout for inspector to compare/double-check with BOM and the ot
Electronics Forum | Fri Jul 21 21:36:24 EDT 2017 | heros_electronics
I checked, there is no BOM in the ZIP. Do you know how to upload the gerber file or screenshot in this forum?
Electronics Forum | Wed Jun 08 03:09:44 EDT 2022 | pradeep14
Thank you. In our organization also we are following loading verification before starting the placement. But i want know before starting the placement during NPI/Proto Build, what are the system need to be followed to cross check with Pick & Place pr
Electronics Forum | Sun Oct 31 17:36:44 EST 2004 | Ian
GerberGrab does exactly this, and it's low cost, and you can use it for a month for free. It is a sophisticated but easy to use reverse engineering tool which will automatically generate top / bottom BOMs with placement and rotation after teaching of
Electronics Forum | Sun Oct 31 17:33:15 EST 2004 | Ian
GerberGrab does exactly this, and it's low cost, and you can use it for a month for free. It is a sophisticated but easy to use reverse engineering tool which will automatically generate top / bottom BOMs with placement and rotation after teaching of
Electronics Forum | Sun Oct 31 17:38:42 EST 2004 | Ian
GerberGrab does exactly this, and it's low cost, and you can use it for a month for free. It is a sophisticated but easy to use reverse engineering tool which will automatically generate top / bottom BOMs with placement and rotation after teaching of
Electronics Forum | Fri Sep 02 11:26:50 EDT 2011 | steffenr
Overkill for sure! Program to BOM: Shouldn't have to verify the program to the BOM once it's been verified unless there is a change. Feeder to BOM" There should be some type of instruction that specifies that part goes on what feeder and where the
Electronics Forum | Sun Apr 23 11:22:37 EDT 2023 | kirill
Well, title. There are couple different FAI machines, but from what I've seen, there is some application that floating around the internet that allows you to scan the assembled board before reflow on AIO machine for JPG file, and then run in into FAI
Electronics Forum | Wed May 15 22:23:38 EDT 2002 | ianchan
Hi mates, need some help to resolve a thumb-twine situation. As a high-mix, low volume prototype build house, we always conduct a first article inspection (FAI) on every model setup conversion in the SMT production Lot run. we do this FAI by mounti