Electronics Forum | Mon Jun 02 19:52:03 EDT 2008 | operator
So what happens in this hypothetical model when the customer provides you all the data you asked for and then your programmer finds out that it is the wrong revision data or the BOM is truncated or the centroids are missing refs, etc... Then new data
Electronics Forum | Mon Nov 30 09:10:12 EST 2015 | spoiltforchoice
How do you cost the products you sell? We do contract work as well as building our own products but both work streams go through the same costing procedures. How you structure your costs really depends on your business. For instance, you can includ
Electronics Forum | Mon Oct 24 14:57:09 EDT 2022 | spoiltforchoice
Indeed, back in 2010 or so I had quotes for a MY100 with a Hydra head,as part of that I did get them to run a theoretical build time for one of our own boards. That came back @ just under 7k cph, it was a pretty sensible board with a nice range of th
Career Center | Warminster, Pennsylvania USA | Management,Production
Process Engineering -Programmed, operated and maintained all automated assembly equipment (SMT, Selective Solder, conformal Coating) -Write procedures for above operation and maintenance. -Create and maintain all work instructions -Write ISO procedur
Career Center | , Pennsylvania USA | Engineering,Production,Quality Control,Research and Development
SKILLS Quote preparation for RFQ projects. Exposure to IPC A 610 and IPC A 600. Knowledge of Potential Failure Mode Effect Analysis (PFMEA), Process control plan (PCP) for new products, based on the Critical to Quality (CTQs). Knowledge in handli