Electronics Forum | Tue Aug 12 09:17:22 EDT 2008 | bobpan
We used a photo-optic sensor powered off the conveyor after the oven that is tied to a relay that trips when a board is seen at the sensor which causes a buzzer to go off. Very simple to make. Good luck.
Electronics Forum | Tue Apr 24 21:00:58 EDT 2018 | marlonbc
Hi All, Would just like to course through this concern on a product that we are contracted to assemble. It is mainly used for an automatic hand sanitizer dispensing product. By design there is a restrictive value of current that it needs to dissipat
Industry News | 2003-05-29 08:40:51.0
Withdrawal of Nam Tai's registration statement filed on Form F-3 for a proposed offering of 3,000,000 common shares of the company
Industry News | 2021-10-31 21:35:44.0
What are the precautions for maintenance of rotary encoders? Rotary encoders are used as speed and displacement feedback sensors, which are mainly applied in servo motors, asynchronous motors, stepper motors, elevator traction machines, and even mechanical shafts. These automatic control field platforms with speed and displacement information feedback ensure the high-precision and stable operation of the machine, thereby improving production efficiency and ensuring safe operation.
Technical Library | 2019-11-12 02:09:22.0
Thermal shock test chamber can be used for testing the chemical change or physical damage on composite materials caused by the thermal expansion and contraction of the sample in the shortest time,which is subjected to extremely and continuous high and low temperature environment.so how to check the temperature recovery time of this chamber? Normally we take following steps to inspect the temepratuire recovering time: 1.Install the temperature sensor at the specified position, and adjust the temperature controller of hot zone and cold zone to the required nominal temperature respectively. 2.The temperature increases and reduces respectively,30min after temperature in two zones reach stable status,record temperature value of the measuring point,pls set the temperature value of two zones to be required nominal temperature. 3.The temperature shock test chamber automatically places the inspected load into theh ot zone,select the corresponding retention time according to regulated standard. 4.Set the transfer time,then the inspection load is transferred from hot zone to cold zone, and the temperature of the measuring point is observed and recorded, and then the reverse conversion of the load from cold zone to hot zone is carried out according to the same method, and the temperature of the measuring point is observed and recorded. www.climatechambers.com
SMTnet Express, February 18, 2021, Subscribers: 27,613, Companies: 11,285, Users: 26,477 Of the 88,000 engineers that visit SMTnet every month, over 87% arrive from using a Search engine ... Why is that??? Every day ... • Members
Surface Mount Technology Association (SMTA) | https://www.smta.org/news/smta_calendar/calendar.cfm
. Through hole paste reflow can benefit using solder bricks to increase joint volume and decrease flux residues. Some placement machine suppliers offer produced cut and form feeders, so solder wire is used, reducing the cost of simple preforms Back in the day the presenter used preforms with vapour phase and
| https://www.smtfactory.com/What-are-the-usage-methods-and-precautions-of-SAMSUNG-Pick-Place-Machine-id3326468.html
head according to the position set in the program. The SAMSUNG Pick & Place Machine placement head will move to the position of picking up the component, turn on the vacuum, and the suction nozzle will go up and down to pick up the component, and then the vacuum sensor
Industrial Sensor Vision International specializes in advanced camera technology of high resolution fast speed cameras for automation, AOI, 2-D/3-D, SPI inspection and wafer inspection.
3 Morse Road 2A
Oxford, CT USA
Phone: +1 203 592 8723