Laser Soldering by nature is a very dialed in process. - Requiring specially formulated flux and solder paste applications that will perform while absorbing a massive amount of energy. What I believe "Gary" is attempting to say is: Laser Soldering c

High mix low volume

Electronics Forum | Wed Apr 16 14:40:17 EDT 2008 | jdengler

Peter, We have 2 Fuji lines. We run from 5 to 5000 piece lots. When we are running near capacity and have a lot of change-overs scheduled we have special operators that will load parts onto feeders and organize the feeders like they will be on the

Re: Programming with F4G

Electronics Forum | Wed Sep 08 23:36:12 EDT 1999 | Jason Tomlinson

| | | Dear all, | | | | | | I don't know if I'm asking at the right place here, since you all seem to be more focused on process problems then programming problems (or perhaps programming isn't a problem for you). | | | | | | I'm using FUJI CP642's

solder dispencing vs printing

Electronics Forum | Thu Jun 21 22:04:18 EDT 2001 | davef

This is my attempt at beating the "Fuzzburg 7" translator used on the SMTnet Forum that mashes everything it sees. Below the next paragraph are three paragraphs,each with a common numering sequence, where each paragraph represents the columns of a t

Moisture free storage units.

Electronics Forum | Mon Jun 16 17:13:24 EDT 2003 | fmonette

John, Maybe you know this already but I just wanted to highlight a few facts about dry cabinets. My experience is that many engineers are not well aware of the industry guidelines and sometimes will buy a dry cabinet without understanding the key f

Dual lane vs. single lane feeders for high mix

Electronics Forum | Thu Dec 14 04:02:40 EST 2017 | spoiltforchoice

"I would expect that any intelligent feeder > enabled machine would pull the correct part no > matter where it is placed on the machine (not > forced by the program)" > > this is true, but you > have to tradeoff the setup time vs production > t

Re: product changeovers

Electronics Forum | Sat Jul 03 13:49:36 EDT 1999 | JohnW

50% reduction in time. One draw back, the availability of feeders... You need 280 feeders max to change over a max capacity of 140 feeder machine (or a variance of a product mix vs. part numbers); then there's 8mm, 12mm, 16mm, sticks feeders that c

Thank you.

Electronics Forum | Tue May 01 13:25:20 EDT 2001 | kaoni

Thank you Wolfgang, My time table is the amount of time it takes to get it right. I hope to have product by next December if possible. Yes, I am starting from ground zero. I need to go 201 because of the size limitations as to what I need to fit in

Re: Wave Rider

Electronics Forum | Mon Jan 04 11:32:59 EST 1999 | Chrys

| Anyone have any experience with ECD's Waverider/MOLE profiling equipment? If so, were they positive experiences? | I use ECD's mole for profiling in the wave and a KIC for profiling in reflow. I like the KIC a whole lot better for a couple of re

Re: product changeovers

Electronics Forum | Sat Jul 03 18:14:03 EDT 1999 | Earl Moon

50% reduction in time. One draw back, the availability of feeders... You need 280 feeders max to change over a max capacity of 140 feeder machine (or a variance of a product mix vs. part numbers); then there's 8mm, 12mm, 16mm, sticks feeders that c


changeover table searches for Companies, Equipment, Machines, Suppliers & Information

Online Equipment Auction of Altronic: Small-Batch Surface Mount & Assembly Facility

Wave Soldering 101 Training Course
Solder Paste Dispensing

High Precision Fluid Dispensers
PCB Handling Machine with CE

Software programs for SMT placement and AOI Inspection machines from CAD or Gerber.
2024 Eptac IPC Certification Training Schedule

Nozzles, Feeders, Spare Parts - Siemens, Fuji, Juki, Yamaha, etc...
Electronic Solutions R3

Low-cost, self-paced, online training on electronics manufacturing fundamentals