Industry Directory: cph real (1)

ELMET Ltd.

Industry Directory | Manufacturer

We offer: SMT placement on automatic high speed line EKRA/MYDATA/SEHO with inline inspection (real speed 30.000 cph, accuracy 15 um, chips 0201 to BGA, COB), THT and final assemblings, OEM products, R&D, components and PCB for best prices. ISO9001.

New SMT Equipment: cph real (26)

Hanwha HM520 Pick and Place Machine

Hanwha HM520 Pick and Place Machine

New Equipment | Pick & Place

Hanwha HM520 Pick and Place Machine Hanwha HM520 Chip Mounter Patch speed: 80,000 CPH size:890x2370x1930mm​ weight:1605KG Product description: Hanwha HM520 modular pick and place machine, it's Hanwha's first modular chip mounter, 890MM length.Patch

Qersa Technology Co.,ltd

Hanwha DECAN S2 Assembly line

Hanwha DECAN S2 Assembly line

New Equipment | Other

Hanwha Decan S2 SMT Assembly line Decan S2 SMT Assembly Line Decan S2 SMT Assembly Line SMT PCB production Full Automatic Assembly line Speed:158000CPH Product description: Hanwha Decan S2 SMT Assembly line, Speed 158000CPH  INQUIRY Ha

Flason Electronic Co.,limited

Electronics Forum: cph real (35)

Re: real placement rates

Electronics Forum | Thu Jul 23 07:33:28 EDT 1998 | The Wretched SMD

200 boards/Hr and oven will reflow ~180 boards/Hr but the P&P machine will only place 700-950 CPH when setup is taken into account. Minimum pitch is normally .020" and we place an Avg. of 491 TSSOPs and 217 BGAs a month. We don't even bother with 04

Re: real placement rates

Electronics Forum | Fri Jul 24 09:50:13 EDT 1998 | Justin Medernach

200 boards/Hr and oven will reflow ~180 boards/Hr but the P&P machine will only place 700-950 CPH | when setup is taken into account. Minimum pitch is normally .020" and we place an Avg. of 491 TSSOPs and 217 BGAs a month. | We don't even bother wit

Used SMT Equipment: cph real (35)

Juki RX-8  Mounter

Juki RX-8 Mounter

Used SMT Equipment | Pick and Place/Feeders

JUKI High-Speed Compact Modular Mounter RX-8 Features ▶High-speed placements of up to 100,000 CPH.*¹ ▶Best-in-class placement rate per square meter(sq ft).*² ▶Integrates seamlessly with the production enviroment. ▶Trace Monitor tracks quali

Qinyi Electronics Co.,Ltd

Panasonic NM-EJM3A

Panasonic NM-EJM3A

Used SMT Equipment | Chipshooters / Chip Mounters

CM602L NM-EJM3A Chip Mounter Panasonic placement machine CM602, CM602-L high-speed module placement machine, CM602 placement machine not only used the original module of Panasonic placement machine CM402, but also added a 12-nozzle high-speed head

Qinyi Electronics Co.,Ltd

Industry News: cph real (20)

APEX 04: No Horizontal Turret Chip-Shooters

Industry News | 2004-02-27 09:43:23.0

At APEX 04' not placement machine manufacturer had a turret head chip-shooter in their booth.

Phoenix United Associates, Inc.

Juki’s reputation for quality and speed continues RX-6 Flex Placer receives a 2013 Global Technology Award

Industry News | 2013-11-12 16:12:53.0

Juki Automation Systems announces that it was awarded a 2013 Global Technology Award in the category of “Placement – Medium to High Volume” for its RX-6 Flex Placer. T

Juki Automation Systems

Parts & Supplies: cph real (1)

Juki High-speed Modular Mounter FX-1R

Juki High-speed Modular Mounter FX-1R

Parts & Supplies | Pick and Place/Feeders

Buy High-speed Modular Mounter FX-1R The High-speed Modular Mounter FX-1R is a traditional modular chip shooter driven at extreme speeds. Refinements in the drive system deliver real world improvements in actual throughput. ■   33,00

ZK Electronic Technology Co., Limited

Videos: cph real (3)

Europlacer XPii

Europlacer XPii

Videos

Modular SMT placement platform with ultimate flexibility. XPii is designed to meet your specific production requirements. It can be used in front of any other Europlacer machine to greatly boost the placement rate of the line or can be used stand alo

EUROPLACER

europlacer iineo in action

europlacer iineo in action

Videos

europlacer iineo, flexible smt placer, in real production

EUROPLACER

Career Center - Resumes: cph real (1)

Equipment Engineer\B Tech (EC)\7.5+ Years Ex

Career Center | Dargaha Road Zameen Pallavaram Chennai, Tamilnadu India | Maintenance,Technical Support

CURRENT JOB: • Responsible for four sub department as Production support, Preventive maintenance activity, Spare parts control and NPI (New product Introduction) under one Equipment department. • Take care of OEE (Overall Equipment Efficiency), MTTR

Express Newsletter: cph real (174)


cph real searches for Companies, Equipment, Machines, Suppliers & Information

Sm t t t t t t t t t t net
  1 2 3 4 5 6 7 8 9 10 Next