Electronics Forum | Mon Mar 13 15:10:52 EST 2000 | Stuart Adams
Assuming agressive design rules what is the minimum distance I can get away with between the board edge and a SMT pad and between the board edge and a plated mounting hole ??? (The board is only 1"x2" and the mounting holes are 80 mil dia, 125 mil
Electronics Forum | Mon Mar 13 15:10:52 EST 2000 | Stuart Adams
Assuming agressive design rules what is the minimum distance I can get away with between the board edge and a SMT pad and between the board edge and a plated mounting hole ??? (The board is only 1"x2" and the mounting holes are 80 mil dia, 125 mil
GPD Global | https://www.gpd-global.com/pdf/doc/Dispense-System-Service-Guide-22290008G.pdf
machine may need to be leveled both before and after the tie down procedure. If tie down clamps are NOT required, skip to Level Machine. 1. Prepare floor as needed using Spacing & Locations (pg 7.11). 2. Verify a minimum of 30 mm of the foot screw thread is
Products, services, training & consulting for the assembly, rework & repair of electronic assemblies. BGA process experts. Manufacturers Rep, Distributor & Service Provider for Seamark/Zhuomao and Shuttle Star BGA Rework Stations.
Training Provider / Manufacturer's Representative / Equipment Dealer / Broker / Auctions / Consultant / Service Provider
1750 Mitchell Ave.
Oroville, CA USA
Phone: (888) 406-2830