Industry News | 2010-05-29 18:57:32.0
MARTIN will demonstrate the Reball/Prebump 03.1 unit at the upcoming SMTA Upper Midwest Expo, scheduled to take place Wednesday, June 9, 2010, at the Sheraton Bloomington Hotel in Bloomington, MN. This standalone unit is an easy and cost effective solution for BGA reballing and QFN solder bumping.
Industry News | 2010-06-30 12:09:49.0
MARTIN will demonstrate the Reball / Prebump 03.1 unit at the upcoming SMTA Ohio Valley Expo & Tech Forum, scheduled for Wednesday, July 14, 2010 at the Doubletree Hotel in Cleveland, OH. This standalone unit is an easy and cost effective solution for BGA reballing and QFN solder bumping.
"The IR 3000 offers advanced surface mount rework capability in an integrated, cost-effective, bench-top work station." This video covers the basic processes of the IR 3000, focusing primarily on: Installations, Removals, Component Alignment and Ins
New Equipment | Rework & Repair Equipment
FINEPLACER® pico rs is an enhanced hot air rework station for assembly and rework of all types of SMD components. The system is a best seller for professional mobile device rework in high density environments. A high level of process modularity allo
New Equipment | Rework & Repair Equipment
Ultimate Performance, BGA Rework Station for small-large PCBs up to 24"/620mm The PDR E6 XL BGA Rework Station is made of only the finest materials and components for optimum precision and rework excellence. PDR's E6 SMD Rework Station is PDR's larg
Technical Library | 2009-11-05 11:17:32.0
Head-in-pillow (HiP), also known as ball-and-socket, is a solder joint defect where the solder paste deposit wets the pad, but does not fully wet the ball. This results in a solder joint with enough of a connection to have electrical integrity, but lacking sufficient mechanical strength. Due to the lack of solder joint strength, these components may fail with very little mechanical or thermal stress. This potentially costly defect is not usually detected in functional testing, and only shows up as a failure in the field after the assembly has been exposed to some physical or thermal stress.
Technical Library | 2016-02-11 18:26:43.0
Although reflow ovens may not have been dramatically changed during the last decade the reflow process changes step by step. With the introduction of lead-free soldering not only operation temperatures increased, but also the chemistry of the solder paste was modified to meet the higher thermal requirements. Miniaturization is a second factor that impacts the reflow process. The density on the assembly is increasing where solder paste deposit volumes decreases due to smaller pad and component dimensions. Pick and place machines can handle more components and to meet this high through put some SMD lines are equipped with dual lane conveyors, doubling solder paste consumption. With the introduction of pin in paste to solder through hole components contamination of the oven increased due to dripping of the paste.
Industry News | 2009-03-18 17:08:59.0
FINETECH will demonstrate today's most requested advanced rework applications in booth #2059 at the upcoming APEX 2009, scheduled to take place March 31 � April 2, 2009 at the Mandalay Bay Convention Center in Las Vegas.
Industry News | 2018-10-18 08:29:16.0
How to Prevent Short Circuits to Ground in QFN Components?